Supported byClarion Energy
HomeMarketsSerbia: Belgrade launches...

Serbia: Belgrade launches geothermal drilling programme for district heating

Belgrade district-heating utility Beogradske Elektrane has launched a tender for exploratory geothermal drilling at its New Belgrade and Miljakovac heating plants, marking a move from geological assessment to on-site testing of potential geothermal resources.

The two locations were identified as having the strongest technical and economic potential for integrating geothermal energy into Belgrade’s district-heating system.

The planned exploratory wells will assess the temperature, volume and availability of underground water and compare the findings with existing geological models. Temperature and geothermal-gradient measurements will be taken at 50-metre intervals throughout the drilling process.

The contractor will also examine rock formations, drilling fluids and gases for indications of groundwater inflows. Laboratory testing will analyse the geological characteristics of the Mesozoic and Neogene formations encountered at the two sites.

The drilling programme represents the third stage of Belgrade’s geothermal initiative. The first two phases focused on geological modelling, resource assessment and technical analysis, while the latest stage is intended to establish whether the identified geothermal resources are suitable for practical use.

If commercially viable resources are confirmed, geothermal heat could help reduce the district-heating system’s reliance on fossil fuels, limit exposure to gas-price volatility and lower emissions. The feasibility of future investment, however, will depend on factors including the temperature and sustainable flow rate of the geothermal water and the cost of integrating the resource with existing heating infrastructure.

Companies have until October 19 to submit their bids. The results of the exploratory drilling will provide a key basis for determining whether geothermal energy can move beyond a diversification concept and become an investable component of Belgrade’s district-heating system.

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Serbia: Vinča waste-to-energy plant reaches one million tonnes of processed waste

The Vinča waste-to-energy plant near Belgrade has processed its first one million tonnes of municipal waste, marking a significant milestone in the Serbian capital’s transition away from traditional landfill disposal. Between August 2021 and August 2026, more than three million...

Serbia’s 2 GW battery pipeline advances into grid contracts as electricity arbitrage shifts

Serbia’s battery storage market is moving from an early-stage development pipeline toward contracted grid access, with around 2 GW of battery energy storage projects now covered by connection agreements. At the same time, roughly 11 GW of wind and...

Serbian renewables face CBAM rule changes affecting actual-emissions evidence for EU imports

The European Parliament on Sept. 15 adopted its negotiating position on a broader revision of the EU Carbon Border Adjustment Mechanism by 464 votes to 50, with 159 abstentions. The vote opened negotiations with EU member states on the...
Supported byVirtu Energy