Supported byClarion Energy
HomeNews Serbia EnergySEE Power Exchanges...

SEE Power Exchanges Trading for October 12, 2016

On the Serbian day-ahead exchange SEEPEX on October 12, 2016 (delivery date: October 13, 2016) trading was carried out at the price of 54.35 EUR/MWh for daily baseload. Trading volume was 1,781.4 MWh.

The price of peak energy for daily peak load was 67.3 EUR/MWh and trading volume was 702.5 MWh.

On the Croatian day-ahead power market CROPEX trading was carried out at the price of 62.84 EUR/MWh for daily baseload.

The price of peak energy for daily peak load was at the level of 79.29 EUR per MWh.

Total trading volume was 571 MWh.

On the Romanian day-ahead power market OPCOM trading was carried out at the price of 39.49 EUR/MWh for daily baseload.

The price of peak energy for daily peak load was at the level of 43.88 EUR per MWh. Trading volume was 46,245.6 MWh.

During off-peak hours the price was 35.09 EUR per MWh, and trading volume was 41,781.5 MWh.

On Hungarian day-ahead power market HUPX trading was carried out at the price of 58.1 EUR per MWh for daily baseload.

The price of peak energy for daily peak load was at the level of 76.24 EUR per MWh.

Total trading volume was 63,183.4 MWh.

On Bulgarian exchange IBEX the price for baseload was 46.24 EUR per MWh.

The price of peak energy was 54.58 EUR per MWh, and trading volume was 5,447 MWh.

During off-peak hours the price was 37.82 EUR per MWh, and trading volume was 4,633.9 MWh.

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Hungary leads SEE power-price surge as lower wind tightens Monday market

Hungarian electricity prices for Monday delivery surged as weekday demand recovered and wind generation declined, creating a high-price zone across Central Europe and widening price spreads with the southern Balkans. The HUPX baseload power price rose by €88.80/MWh from Sunday...

HSE construction permit for 1.38-MW solar and 1.25-MW/5-MWh battery in Zagorje ob Savi

Slovenian power utility HSE has secured a construction permit for a solar and battery project at the former Kamnolom Zagorje municipal landfill in Zagorje ob Savi. The development is linked to plans for site redevelopment in 2027. Planned generation,...

OMV Petrom to add 20-MW/40-MWh battery at Ișalnița solar site

OMV Petrom plans to add a 20-MW/40-MWh battery to its Ișalnița solar project in Romania, converting the development into a hybrid renewable generation and storage facility. The battery addition is linked to the Ișalnița site in Dolj county. Battery...
Supported byVirtu Energy