Supported byClarion Energy
HomeNews Serbia EnergySEE Power Exchanges...

SEE Power Exchanges Trading for March 20, 2017

On the Serbian day-ahead exchange SEEPEX on March 20, 2017 (delivery date: March 21, 2017) trading was carried out at the price of 44.87 EUR/MWh for daily baseload. Trading volume was 4,266 MWh.

The price of peak energy for daily peak load was 48.23 EUR/MWh and trading volume was 2,172.3 MWh.

On the Croatian day-ahead power market CROPEX trading was carried out at the price of 53.36 EUR/MWh for daily baseload.

The price of peak energy for daily peak load was at the level of 58.82 EUR per MWh.

Total trading volume was 483 MWh.

On the Romanian day-ahead power market OPCOM trading was carried out at the price of 51.56 EUR/MWh for daily baseload.

The price of peak energy for daily peak load was at the level of 57.59 EUR per MWh. Trading volume was 37,273.5 MWh.

During off-peak hours the price was 45.53 EUR per MWh, and trading volume was 34,394 MWh.

On Hungarian day-ahead power market HUPX trading was carried out at the price of 51.56 EUR per MWh for daily baseload.

The price of peak energy for daily peak load was at the level of 57.59 EUR per MWh.

Total trading volume was 50,489.7 MWh.

On Bulgarian exchange IBEX the price for baseload was 42.16 EUR per MWh.

The price of peak energy was 51.37 EUR per MWh, and trading volume was 5,635.6 MWh.

During off-peak hours the price was 32.96 EUR per MWh, and trading volume was 5,285.1 MWh.

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

SEE power prices ease as imports increase, while Serbia defies regional trend

Southeast European day-ahead electricity prices declined across most markets for Wednesday delivery, narrowing Hungary’s premium over Germany. At the same time, higher gas and carbon costs continued to support firmer forward power prices. Serbia moved against the broader regional trend,...

North Macedonia’s electricity trading jumps 74% as September prices rise

Electricity traded on North Macedonia’s MEMO day-ahead exchange rose 74% year on year to 179.2 GWh in September, pointing to increased participation and growing use of the organised electricity market. Despite the strong annual increase, trading volumes fell 10.3% from...

Serbia plans North Macedonia gas interconnector construction start, aiming Q1 2028

Pipeline scope and early works near Vranjska Banja Serbia is targeting early 2028 completion for its gas interconnector with North Macedonia, with construction planned to start and reach completion in the first quarter of 2028. Initial works near Vranjska Banja...
Supported byVirtu Energy