Supported byClarion Energy
HomeSEE Energy NewsRomania: Geothermal energy...

Romania: Geothermal energy for district heating

Romania’s municipality of Oradea is seeking for a contractor to design and build a system that would better use the city’s geothermal potential, particularly the already existing well in the western part of the city, including its possible enlargement.

The project aims to use local geothermal renewable energy resources for supplying heating and hot water through more intensive exploitation of thermal energy production capacity in the central heating system SACET Oradea from deep drilling wells.

The tender documentation reads that the object of the project is to present the development alternative of the geothermal water exploitation in the Oradea geothermal perimeter to replace on a larger scale the production of conventional thermal energy, obtained by burning fossil fuels, with the production of geothermal energy, obtained by extracting as high flows of geothermal water as possible, heated by the terrestrial thermal flow and injecting the thermal wastewater into the collector.

 

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Romania’s Cernavoda nuclear restart delayed by low Danube levels

Romania is dealing with a prolonged nuclear outage at the Cernavoda plant, with persistently low Danube river levels delaying restart conditions. Both reactors have been offline since Aug. 13. Unit 1 had already stopped in July before unit 2...

Econergy launches 70 MW battery with Parau 1 solar in Romania

Renewable developer Econergy has placed a 70 MW/141 MWh battery into commercial operation alongside its Parau 1 solar plant in Romania. The project is positioned as a merchant solar-storage combination. The investment in the combined development reached around €85...

Enercon to deliver 7-MW turbines for Qair’s Cobadin I wind farm in Romania

Enercon will supply its E-175 EP5 E2 turbine platform for Qair’s Cobadin I wind farm in Romania. The project is described as a 50-MW development under the first phase of the Cobadin complex. The deployment marks the first time...
Supported byVirtu Energy