Supported byClarion Energy
HomeHydroBosnia and Herzegovina,...

Bosnia and Herzegovina, ERS subsidiary to maintain liquidity with 5 million euros loan

“Hidroelektrane na Drini”, a subsidiary of state- owned power utility ERS which operates hydropower plant Visegrad, is seeking a loan worth some 5 million euros in order to maintain liquidity in the coming period.

Namely, the subsidiary launched a public call for commercial banks interested in providing a loan of 5 million euros. The loan was not included in the public procurement plan for this year, so it will be included in the plan’s rebalancing.

“Hidroelektrane na Drini” is looking for a loan with the maturity of one year, with fixed interest rate of 4.9 % and is prepared to pay up to 260,000 euros for the loan’s servicing fees.

Last month, parent company ERS obtained a loan worth 5 million euros for the purchase of necessary fuel for the winter season, while coalmine and thermal power plant (RiTE) Gacko recently launched a call for 1.3 million euros loan that will be used for the purchase of energy supplies.

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Republic of Srpska Plans Tighter Solar Rules After 3,064 Hectares Reclassified

Authorities in Bosnia and Herzegovina’s Republic of Srpska are preparing tighter restrictions on photovoltaic developments on agricultural land. The rapid expansion of solar power has contributed to the conversion of thousands of hectares of farmland. The entity’s agriculture ministry...

Federation of Bosnia electricity output rises 15.3% as coal production falls

Gross electricity production in the Federation of Bosnia and Herzegovina reached 534 GWh in September, up 15.3% from 463 GWh in September 2025. The rise came as domestic coal output continued to decline. Electricity generation increasingly relied on hydropower...

Bosnia’s August power output falls to 1,090 GWh as imports rise

Gross electricity generation in Bosnia and Herzegovina’s power sector totalled 1,090 GWh in August. That was down from 1,122 GWh a year earlier, as lower thermal output outweighed gains in hydropower and renewables. Thermal plants supplied 62.1% of gross...
Supported byVirtu Energy