Copelouzos Group accelerates 4.2...

The Greek Copelouzos Group is fast-tracking the development of its 4.2 billion euro...

Greece: Domestic gas consumption...

According to data from Greece's natural gas transmission system operator, DESFA, domestic gas...

Croatia: CROPEX sets record...

CROPEX' intraday continuous market set a new record on 13 January 2025, with...

Bulgaria sees growth in...

In 2024, Bulgaria added 938 MW of renewable electricity capacity, building on a...
Supported byClarion Energy banner
HomeUncategorizedSerbia: Fortis Energy...

Serbia: Fortis Energy buys 180 MW solar and energy storage project

Turkish company Fortis Energy has announced the acquisition of a 180 MW solar project with an integrated Battery Energy Storage System (BESS) in Sremska Mitrovica, Serbia. This solar park, which will also feature an energy storage system, is set to become one of the largest of its kind in Southeast Europe.

The project includes a 36 MW/h BESS, designed to store and manage electricity, enhancing the reliability and integration of renewable energy sources into the network. Construction is planned to start in 2025.

Fortis Energy’s investment underscores its ongoing commitment to advancing the energy transition. The acquisition enhances its extensive and adaptable renewable energy portfolio across the Balkans and Turkey, solidifying its position as a key provider of flexibility solutions in the European market.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Serbia secures 67 million euro loan guarantee for Vlasinske hydropower plants refurbishment

The Serbian Government has signed an agreement with the European Bank for Reconstruction and Development (EBRD) to secure a 67 million euro loan guarantee for the refurbishment of the Vlasinske hydropower plants. The loan, accessible over a five-year period,...

Copelouzos Group accelerates 4.2 billion euro Egypt-Greece electricity interconnection project

The Greek Copelouzos Group is fast-tracking the development of its 4.2 billion euro submarine electricity interconnection with Egypt, with plans to complete construction and begin operations by 2030. The interconnector, known as GREGY, has already attracted significant interest from European...

Croatia: CROPEX sets record in 15-minute and 60-minute product trading on 13 January 2025

CROPEX' intraday continuous market set a new record on 13 January 2025, with 987.23 MWh traded in 15-minute products. In addition, the trading volume of 60-minute products reached 7,060.20 MWh, bringing the total daily volume for the delivery day...
Supported bySEE Mining News
error: Content is protected !!