Supported byClarion Energy
HomeUncategorizedReservoir Minerals mining...

Reservoir Minerals mining exploration projects in Serbia

 

 

Canadian Reservoir Minerals company is one of the first foreign investors in Serbian mining sector. Below is the status update of their 2 projects, results of the mining activities.

Company’s 100%-owned Stara Planina Exploration Permit in Serbia has historic mining production of high grade copper and gold mineralizatio.

Aljin Do Project

The Aljin Do prospect is located in the Company’s 100%-owned Stara Planina Exploration Permit in Serbia. Mineralization containing copper, gold, bismuth and antimony at Aljin Do is hosted by quartz veins and structurally controlled zones of intense silicification over a strike length of 1100 metres. The silicification zone is up to 40 metres wide. There was minor production from this mineralization in the 20th century, with various historical sources quoting grades of 24 – 62 grams per tonne (“g/t”) gold and 4 – 6 percent copper. Reconnaissance sampling by the Company yielded 13 samples containing greater than 5 g/t gold, with maximum 70 g/t gold. Ground magnetometry, induced polarisation geophysics, detailed geological mapping, and 3-D modeling of the geology and historic workings have been undertaken in preparation for drilling.

Plavkovo Project

The Company has concluded a two-hole drilling campaign to test the intense hydrothermal alteration and surface gold mineralization, coupled with a strong geophysical induced polarization anomaly, in the “Gypsum Zone” at the eastern of the Plavkovo prospect in the Company’s 100%-owned Plavkovo Exploration Permit in Serbia.

Drill hole PV-1 intersected hydrothermally altered andesites and tuffs that are locally brecciated. Disseminated pyrite and pyrite-quartz veins are recorded throughout the length of core, and copper is anomalous (100 to maximum 914 parts per million) in the core from 12.4 to 90.8 metres. Drill hole PV-2 intersected a similar sequence of altered tuffs and andesites. Analysis of the core is on-going, and the best result to date is 1.32 g/t gold over 3.3 metres from 57.8 to 61.1 metres in drill hole PV-2. The alteration and mineralization is considered to be intermediate-sulfidation epithermal in type, and occurs at the eastern end of an 800 meter long, east-west trending, 150 meter wide zone of outcropping copper-gold mineralization.

Source Serbia-energy.com

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

SEE power prices ease as imports increase, while Serbia defies regional trend

Southeast European day-ahead electricity prices declined across most markets for Wednesday delivery, narrowing Hungary’s premium over Germany. At the same time, higher gas and carbon costs continued to support firmer forward power prices. Serbia moved against the broader regional trend,...

North Macedonia’s electricity trading jumps 74% as September prices rise

Electricity traded on North Macedonia’s MEMO day-ahead exchange rose 74% year on year to 179.2 GWh in September, pointing to increased participation and growing use of the organised electricity market. Despite the strong annual increase, trading volumes fell 10.3% from...

Serbia plans North Macedonia gas interconnector construction start, aiming Q1 2028

Pipeline scope and early works near Vranjska Banja Serbia is targeting early 2028 completion for its gas interconnector with North Macedonia, with construction planned to start and reach completion in the first quarter of 2028. Initial works near Vranjska Banja...
Supported byVirtu Energy