Supported byClarion Energy
HomeSEE Energy NewsOKTA commissions 3...

OKTA commissions 3 MW battery storage with North Macedonia 12 MW solar plant

North Macedonia’s OKTA has started operating battery storage alongside its 12 MW solar plant, marking the company’s first move into electricity storage. The project adds two battery containers that have entered operation. A third container is scheduled to be commissioned in the coming months.

When fully completed, the installation is expected to provide around 3 MW of power and 6 MWh of storage capacity. OKTA estimates the system could store about 2,100 MWh of electricity over a year.

Battery storage role for solar output and market exposure

The battery is designed to shift solar production from periods of high generation into hours with stronger demand or more favourable market prices. This arrangement is intended to give the plant greater control over its wholesale-market exposure. The storage operation therefore links solar generation timing with market conditions.

OKTA’s expansion beyond conventional energy infrastructure

For OKTA, traditionally associated with petroleum supply and conventional energy infrastructure, the battery project also represents a broader move into renewable generation and flexibility assets. The development expands the company’s footprint from solar generation into electricity storage capability.

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

North Macedonia June generation drops 13.2% as solar output declines

North Macedonia’s gross electricity production decreased 13.2% year on year to 408,045 MWh in June. The figures were released against a backdrop of drought and high temperatures affecting system operation. Electricity from thermal power plants totaled 131,405 MWh, down...

Serbia–North Macedonia gas interconnector enters implementation phase, linking to Greek LNG

Serbia and North Macedonia have moved their planned gas interconnector into the implementation phase. The project is designed to strengthen a northbound supply route connecting the Serbian market with Greek LNG infrastructure and the Southern Gas Corridor. Implementation agreement...

North Macedonia to join Vertical Gas Corridor in September

North Macedonia plans to join the Vertical Gas Corridor in September. The move is aimed at shifting the country’s gas system from a relatively isolated national network to a wider north-south supply route across Southeast Europe. The corridor entry...
Supported byVirtu Energy