Supported byClarion Energy
HomeNews Serbia EnergySEE Power Exchanges...

SEE Power Exchanges Trading for October 19, 2016

On the Serbian day-ahead exchange SEEPEX on October 19, 2016 (delivery date: October 20, 2016) trading was carried out at the price of 49.08 EUR/MWh for daily baseload. Trading volume was 2,092.6 MWh.

The price of peak energy for daily peak load was 54.71 EUR/MWh and trading volume was 1,333.8 MWh.

On the Croatian day-ahead power market CROPEX trading was carried out at the price of 53.51 EUR/MWh for daily baseload.

The price of peak energy for daily peak load was at the level of 58.09 EUR per MWh.

Total trading volume was 596.8 MWh.

On the Romanian day-ahead power market OPCOM trading was carried out at the price of 49.44 EUR/MWh for daily baseload.

The price of peak energy for daily peak load was at the level of 54.41 EUR per MWh. Trading volume was 38,404.8 MWh.

During off-peak hours the price was 44.47 EUR per MWh, and trading volume was 35,170.2 MWh.

On Hungarian day-ahead power market HUPX trading was carried out at the price of 50.68 EUR per MWh for daily baseload.

The price of peak energy for daily peak load was at the level of 55.64 EUR per MWh.

Total trading volume was 45,559 MWh.

On Bulgarian exchange IBEX the price for baseload was 33.71 EUR per MWh.

The price of peak energy was 39.65 EUR per MWh, and trading volume was 4,502.9 MWh.

During off-peak hours the price was 27.78 EUR per MWh, and trading volume was 4,040.1 MWh.

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Lower wind and costly gas lift SEE power prices 11/9, but Serbia decouples

Southeast European day-ahead electricity prices strengthened on Friday as weaker wind generation, firm gas costs and reduced imports tightened the regional balance, while Serbia decoupled sharply from neighbouring markets. Hungary’s HUPX baseload price rose €5.60/MWh to €208.98/MWh, almost matching Romania...

Romania’s Cernavoda nuclear restart delayed by low Danube levels

Romania is dealing with a prolonged nuclear outage at the Cernavoda plant, with persistently low Danube river levels delaying restart conditions. Both reactors have been offline since Aug. 13. Unit 1 had already stopped in July before unit 2...

Econergy launches 70 MW battery with Parau 1 solar in Romania

Renewable developer Econergy has placed a 70 MW/141 MWh battery into commercial operation alongside its Parau 1 solar plant in Romania. The project is positioned as a merchant solar-storage combination. The investment in the combined development reached around €85...
Supported byVirtu Energy