Supported byClarion Energy
HomeNews Serbia EnergySEE Power Exchanges...

SEE Power Exchanges Trading for November 03, 2016

On the Serbian day-ahead exchange SEEPEX on November 03, 2016 (delivery date: November 04, 2016) trading was carried out at the price of 46.75 EUR/MWh for daily baseload. Trading volume was 1,643.3 MWh.

The price of peak energy for daily peak load was 51.09 EUR/MWh and trading volume was 764.6 MWh.

On the Croatian day-ahead power market CROPEX trading was carried out at the price of 42.65 EUR/MWh for daily baseload.

The price of peak energy for daily peak load was at the level of 45.89 EUR per MWh.

Total trading volume was 239 MWh.

On the Romanian day-ahead power market OPCOM trading was carried out at the price of 44.37 EUR/MWh for daily baseload.

The price of peak energy for daily peak load was at the level of 47.61 EUR per MWh. Trading volume was 40,078.7 MWh.

During off-peak hours the price was 41.13 EUR per MWh, and trading volume was 34,743 MWh.

On Hungarian day-ahead power market HUPX trading was carried out at the price of 44.37 EUR per MWh for daily baseload.

The price of peak energy for daily peak load was at the level of 47.61 EUR per MWh.

Total trading volume was 59,490.7 MWh.

On Bulgarian exchange IBEX the price for baseload was 41.14 EUR per MWh.

The price of peak energy was 45.98 EUR per MWh, and trading volume was 5,520.6 MWh.

During off-peak hours the price was 36.31 EUR per MWh, and trading volume was 4,752 MWh.

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Lower wind and costly gas lift SEE power prices 11/9, but Serbia decouples

Southeast European day-ahead electricity prices strengthened on Friday as weaker wind generation, firm gas costs and reduced imports tightened the regional balance, while Serbia decoupled sharply from neighbouring markets. Hungary’s HUPX baseload price rose €5.60/MWh to €208.98/MWh, almost matching Romania...

Romania’s Cernavoda nuclear restart delayed by low Danube levels

Romania is dealing with a prolonged nuclear outage at the Cernavoda plant, with persistently low Danube river levels delaying restart conditions. Both reactors have been offline since Aug. 13. Unit 1 had already stopped in July before unit 2...

Econergy launches 70 MW battery with Parau 1 solar in Romania

Renewable developer Econergy has placed a 70 MW/141 MWh battery into commercial operation alongside its Parau 1 solar plant in Romania. The project is positioned as a merchant solar-storage combination. The investment in the combined development reached around €85...
Supported byVirtu Energy