Supported byClarion Energy
HomeElectricityRomanian state offers...

Romanian state offers subsidies for increasing household energy efficiency

The Romanian government created the new program “Energy Efficient House” which will run for 18 months. The Romanian state will cover up to 60 % of costs of homeowners who want to increase the energy efficiency of their residences.

Romanian Environment Minister Costel Alexe said that subsidies cannot exceed 15,000 euros per applicant, while total funds allocated for the program amount to some 100 million euros, which means that subsidies will be granted to up to 9,000 applicants.

By using these funds homeowners will be able to install thermal insulation systems, better insulating windows, gas-fired boilers using condensation technology, solar panels, LED lighting systems, and any other systems that can improve the energy efficiency of their houses.

Minister Alexe stressed that there will be no paperwork, and all the procedures could be completed online. The only documents required are the homeowner’s ID card, proof of ownership, and energy efficiency certificate, and an audit to show how the energy efficiency will improve with the investment.

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Bulgaria power surplus expands on stronger hydropower and renewables

Production and demand trends to Sept. 6 Bulgaria’s electricity production increased 9.65% year on year to 30.64 TWh between Jan. 1 and Sept. 6, according to data from Bulgaria’s Electricity System Operator. Domestic consumption rose 7.77% to 28.04 TWh over...

Enercon to deliver 7-MW turbines for Qair’s Cobadin I wind farm in Romania

Enercon will supply its E-175 EP5 E2 turbine platform for Qair’s Cobadin I wind farm in Romania. The project is described as a 50-MW development under the first phase of the Cobadin complex. The deployment marks the first time...

Romania delays Cernavodă restart amid Danube drought, extending nuclear outage

Romania is unlikely to restart either reactor at the Cernavodă nuclear plant for at least another 10 days, pushing recovery beyond mid-September. The delay extends the loss of around 1.3-1.4 GW of baseload generation and keeps Romania reliant on...
Supported byVirtu Energy