In April 2025, total electricity consumption in North Macedonia reached 460,185 MWh. Natural gas consumption totaled 6.79 million cubic meters, coal consumption was 305,848 tons, and petroleum products consumption stood at 101,241 tons, according to the State Statistical Office.

Domestic electricity production covered 73.6% of the consumed electricity in April. Nearly all coal consumed (99.9%) was used for electricity generation.

Total gross electricity production in April 2025 was 338,832 MWh, a decrease of 27.8% compared to April 2024. Breakdown by source is as follows:

  • Thermal power plants produced 152,185 MWh (44.9%), down 42.4% year-on-year.
  • Hydropower plants generated 131,730 MWh (38.9%), an increase of 42.2%.
  • Combined Heat and Power (CHP) plants contributed 1,157 MWh (less than 1%).
  • Wind farms produced 20,100 MWh (5.9%).
  • Biogas plants generated 4,755 MWh.
  • Solar power plants produced 28,904 MWh.

Electricity imports in April rose to 156,224 MWh, compared to 106,734 MWh a year earlier. Exports fell to 34,871 MWh from 69,648 MWh in April 2024.

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Serbia power market absorbs 13.5% load rise while staying net exporter

Week 34 demand and regional comparison Serbia’s electricity system absorbed a 13.5% increase in load during Week 34 while maintaining export capacity. Electricity demand rose 13.54% versus Week 30, while a wider set of monitored markets saw a 6.42% decline....

North Macedonia June generation drops 13.2% as solar output declines

North Macedonia’s gross electricity production decreased 13.2% year on year to 408,045 MWh in June. The figures were released against a backdrop of drought and high temperatures affecting system operation. Electricity from thermal power plants totaled 131,405 MWh, down...

Serbia–North Macedonia gas interconnector enters implementation phase, linking to Greek LNG

Serbia and North Macedonia have moved their planned gas interconnector into the implementation phase. The project is designed to strengthen a northbound supply route connecting the Serbian market with Greek LNG infrastructure and the Southern Gas Corridor. Implementation agreement...