Macedonia, Electricity consumption in North Macedonia in November 2021 amounted to 699,451 MWh

Total electricity consumption in North Macedonia in November 2021 amounted to 699,451 MWh, natural gas consumption amounted to 47.97 million cubic meters, coal consumption reached 319,373 tons, while the consumption of petroleum products stood at 102,983 tons.

According to the data from State Statistical Office, 58.5 % of electricity consumed in November was covered by domestic production, while 94.4 % of the total coal consumption was used for electricity production.

Total net production of electricity in Macedonia in November 2021 stood at 385,603 MWh, which is by 0.8 % higher compared to the same month last year. 147,063 MWh or 38.1 % was produced at thermal power plants (- 17.7 % compared to November 2020), 68,715 MWh or 17.8 % was produced at hydropower plants (+ 118.2 %), 158,352 MWh or 41.1 % in CHP plants (approximately the same as in November 2020)
and 5,859 MWh or 1.5 % was produced by Bogdanci wind farm.

Production at biogas power plants reached 4,608 MWh, while solar power plants produced 1,006 MWh of electricity in November.

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

North Macedonia aims for 38% renewables share by 2030

North Macedonia is targeting 38% renewable energy as a share of gross final energy consumption by 2030. The programme includes rapid solar expansion and additional hydropower generation, with parts of the plan reported to be ahead of the planned...

North Macedonia generation drops 22% in July as renewables rise

North Macedonia’s gross electricity generation declined 22.3% year on year to 460,035 MWh in July, even as hydro and wind output increased. The month’s generation mix included higher contributions from hydropower and wind compared with the same period a...

Envision selected for turbines in Stip wind project first phase, North Macedonia

Alcazar Energy Partners has reached financial close for the Stip wind project in North Macedonia. The first phase totals 131.25 MW and has moved toward construction after securing financing and selecting Envision Energy as turbine supplier. The project is...