Forecast of consumption growth and possibilities

In the period from 2001 to 2010, the average annual growth rate of total electricity consumption in Serbia is expected to be around 1.2 percent and that of peak capacity is expected to be around 0.8 percent. A comparatively steady growth of electricity consumption in industry of around 4.3 percent annually and a slight decline of low voltage consumption of around 0.2 percent annually will lead to a reduction of uncontrolled consumption. Gross electricity consumption will reach 33260 GWh in 2006, and peak capacity will reach 6363 MW. In 2010, the consumption will be 34,950GWh, and the peak capacity will be 6,626MW.

Long-term agreed electricity deliveries to other systems include 1,065 GWh annually to the Electric Power Industry of Montenegro, in exchange for using HPP Piva (with an expected generation of 760 GWh) in the electric power system of EPS. Energy consumption for pumping water in reversible and pump-storage plants is around 1,100 GWh annually.

Under such conditions and measures, along with investment activities given in the following, which assumes improved state and revitalization, an energy and capacity deficit, namely energy deficit between 3,600 and 1600 GWh annually can be expected up to the year 2006, under average hydrology conditions (in dry years it is considerably higher). It is only after the commissioning of the second block in TPP Kolubara B (or a possible alternative) that EPS can expect to cover the consumption in the Republic of Serbia from its own resources.

Until then, the deficit must be covered through imports of electricity.

The total investment requirements of the Electric Power Industry in the following five years are estimated to be around 2.4 billion US Dollars. A significant part of investments must be provided by EPS from its internal sources. Higher prices and positive business management of EPS is an inevitable requirement for providing any other form of investment. This assumes the following:

  • Donations, in a smaller amount,
  • Loans provided by international institutions and other creditors,
  • Direct foreign investments.

Heat

District Heating in Serbia

  • 52 towns
  • Installed capacity 6.600 MWt (40 % in capital city of Belgrade)
  • Average age:
    • Boilers 28.1 years
    • Network 20.6 years
    • Substation 20.5 years
  • Average P/A delivery – 5300 GWt
    • 17% households (400,000 apartments)
  • Average consumption P/A 550,000 toe
    • 65% natural gas, 18% heavy fuel oil, 2% electricity, 15% coal
    • Biomass 0%
    • Solid waste 0%
  • No cogeneration

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Serbia drives Southeast European power price decline as renewables narrow regional spreads

Southeast European day-ahead electricity prices fell sharply for Wednesday delivery, as stronger wind and solar generation, improved domestic output and lower import requirements eased the supply pressure that had pushed regional markets well above Western European benchmarks a day...

Bulgaria launches 300 MWh Tesla battery project as energy storage expansion gains momentum

Bulgaria has begun construction of a 300 MWh battery energy-storage facility in Tvarditsa, marking the first stage of a broader investment programme worth more than €350 million. The programme includes three battery projects with a combined storage capacity of...

Bosnia and Herzegovina: ERS secures new loans as Ugljevik shutdown intensifies financial strain

Bosnia and Herzegovina’s state-owned power utility ERS has secured another €2 million in short-term financing, bringing the total amount of new borrowing arranged within just a few days to €7 million. The additional funds come as the company faces...
Supported byVirtu Energy