Electricity

Structure of Power Sector

Installed generation capacity:

8,355 MW

of which

Thermal:

62 %

 

Nuclear:

0 %

 

Hydro:

34 %

 

Fuel oil-fired, gas-fired and CHP plants

4 %

 

Structure of Electric Energy Generation and Transmission

The EPS Thermal Power Plants

26,546 GWh

The EPS Hydro Power Plants

11,924 GWh

Withdrawn from the neighbouring systems

7,.926 GWh

Injected into the neighbouring systems

8,474 GWh

Transmission losses on all voltage levels (400 / 110 kV)

1,423GWh

 

Substations and Hi-Voltage Trunks in Serbian electricity grid

Substations (total: 87)

Hi-voltage Trunks

Voltage level

Installed capacity

Line length

Voltage level

400 kV

7 150 MVA

1 538 km

400 kV

220 kV

7 050 MVA

2 151 km

220 kV

110 kV

13 150 MVA

5 720 km

110 kV

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Hungary and Serbia electricity prices surge as SEE import dependence grows and German price gap widens

Southeastern European day-ahead electricity markets showed sharp price divergence on Thursday, with Hungary and Serbia trading above €260/MWh as stronger demand, tighter regional supply and continued reliance on imports pushed prices higher. At the same time, electricity prices declined...

Greece moves forward with first biomethane production facility

Greece is moving ahead with the development of its first biomethane production facility, following the issuance of an installation permit to DEPA Trade for a renewable gas unit at an existing biogas plant in Epirus. The project will be developed...

Slovenia’s Brežice Solar Complex Reaches 15.34 MW

HESS, Slovenia’s hydropower producer, has commissioned two solar facilities at the Brežice hydropower plant, bringing total photovoltaic capacity at the site to 15.34 MW. HESS describes the expanded facility as Slovenia’s largest solar complex. The new installations are named...
Supported byVirtu Energy