Supported byClarion Energy
HomeGasCroatia: Commercial operations...

Croatia: Commercial operations to start at Krk LNG terminal

On 1 January, in Omisalj on the island of Krk, the first LNG tanker, the Tristar Ruby, carrying 143,000 cubic meters of liquefied natural gas (LNG) arrived at the floating LNG terminal, thus marking the launch of the terminal’s commercial operations.

Director of the terminal’s operator LNG Hrvatska Hrvoje Krhen said that the Tristar Ruby arrived from the United States and that after the liquefied gas was converted back to natural gas, it would be transported to buyers by pipelines. Commercial operations were launched after a month-long trial period of all units at the floating LNG terminal.

The floating LNG terminal accepts LNG from ships and after its regasification, gas is transported via the pipeline system to end-buyers. The terminal consists of the LNG Croatia ship, a Floating Storage & Regasification Unit (FSRU), a jetty with auxiliary facilities, and a connection pipeline leading to the new Omisalj-Zlobin gas pipeline which connects the terminal with Croatia’s gas network.

The LNG Croatia ship has a capacity of 140,000 cubic meters and a regasification capacity of 300,000 cubic meters per hour, which means an annual capacity of 2.6 billion cubic meters of gas. All of the terminal’s capacity has been leased for the next three years, 80 % of its capacity has been leased until 2027 and around 50% until 2035.

 

 

 

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Croatia extends regulated petrol and diesel price caps for another seven days

Croatia will keep regulated petrol and diesel prices unchanged for another seven days as wholesale fuel costs rise. The measure relies on further reductions in excise duties and supplier margins to offset higher wholesale costs. The government said the...

Croatia launches €38 million household clean-energy grants with battery storage

Croatia opened applications on Tuesday for a €38 million household clean-energy programme that includes support for battery storage for the first time. Authorities said the measure is intended to shift more rooftop solar output into evening demand periods. The...

Croatia records highest summer hourly demand as evening peak surpasses winter

Croatia’s electricity demand reached a record summer hourly level of 3,400.5 MWh in August, exceeding both the country’s previous summer maximum and the latest winter peak. The highest point occurred at around 21:00, after most photovoltaic output had disappeared...
Supported byVirtu Energy