Supported byClarion Energy
HomeOilSlovenia: Decreased profit...

Slovenia: Decreased profit at Petrol in the first nine months of 2020

In the first nine months of 2020, Slovenian energy group Petrol announced that it recorded a net profit in the amount of 40.5 million euros, which is by 49 % lower compared to the same period last year. The group’s sales revenue dropped by 30 % year-on-year to 2.29 billion euros in January-September 2020 period, due to lower sales of petroleum products, resulting from the lockdown measures taken to curb the coronavirus pandemic.

The group’s earnings before interest, taxes, depreciation, and amortization (EBITDA) dropped by 25 % to 114.4 million euros in the first nine months of 2020, however, the result was comparatively better than the one of the main regional competitors.

Some 44 % of the EBITDA was generated by sales of petroleum products, 21 % came from merchandise sales and related services, 17 % came from the sale of other energy products (natural gas, electricity, LPG), 15 % was generated by energy and environmental solutions, while sales of renewable energy accounted for the remaining 3 %.

In January-September 2020, Petrol group sold 2.3 million tons of petroleum products, which is by 21 % lower compared to the same period in 2019. The sale of liquefied petroleum gas fell by 17 % to 114,300 tons, while the volume of sold natural gas amounted to 19.9 TWh.

At the end of September, Petrol operated 510 service stations, including 318 in Slovenia, 110 in Croatia, 42 in Bosnia and Herzegovina, 15 in Serbia, 15 in Montenegro and 10 in Kosovo.

 

 

 

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Krško nuclear plant generates 487,438 MWh in September 2026, misses target

The Krško nuclear power plant, jointly owned by Slovenia and Croatia, produced 487,438 MWh of net electricity in September 2026. Output was 1.53% below the plant’s monthly production target for the month. The reported shortfall followed a plan to...

Enery begins Jezerce hybrid solar-battery build with €88/MWh municipal offtake

Vienna-based renewable energy group Enery has started construction of a hybrid solar and battery facility in Slovenia at the Jezerce project near Divača. The installation combines 7.68 MW of photovoltaic capacity with 12 MWh of electricity storage. Project location...

Slovenia’s industrial power-sharing model delivers measurable savings as market scales

Slovenia’s electricity-sharing market is beginning to deliver measurable savings for industrial consumers, strengthening the case for an emerging energy-service model focused on allocating existing renewable generation more efficiently rather than building additional generation assets. Slovenian energy technology company SunContract said...
Supported byVirtu Energy