Supported byClarion Energy
HomeElectricityRomania to add...

Romania to add 2.5 GW of new power capacity in 2025, driven by renewables and gas

Romania is set to add 2.5 GW of new electricity generation capacity in 2025, marking a major increase from the previous year, according to Energy Minister Sebastian Burduja. The boost comes from a mix of gas and renewable projects, supporting the country’s long-term energy strategy.

Among the main contributors is a new 430 MW gas unit at the Iernut power plant. One or possibly two units at the Mintia power plant, part of a larger 1.7 GW project, are also expected to come online this year. Additionally, renewable energy projects backed by the EU’s Resilience Facility are projected to bring over 1 GW of capacity by year-end.

In 2026, the Mintia plant is expected to be fully completed, while another 1.3 GW of new capacity is planned to connect to the grid.

By the end of 2025, Romania’s total installed generation capacity is expected to reach 24 GW. This development is in line with the country’s 2025–2035 energy roadmap. The planned mix includes 5 GW from wind, 4 GW from solar, and 7 GW from hydropower—primarily provided by Hidroelectrica.

Looking ahead to 2030, Romania aims to increase its generation capacity to 30 GW. Of this, 15 GW is expected to come from solar and wind, underlining a strong national shift toward renewable energy.

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Rompetrol Rafinare boosts Petromidia storage capacity amid refinery upgrade

Rompetrol Rafinare is expanding storage capacity at its Petromidia refinery as part of a programme aimed at improving the flexibility and reliability of crude oil and fuel logistics. The company’s works include changes to tank capacity and refurbishment across...

Romania emergency Danube measures for cooling-water supply at Cernavoda

Three-stage plan tied to intake basin water level Romania has approved an emergency intervention plan aimed at maintaining cooling-water supplies for the Cernavoda nuclear power plant amid exceptionally low Danube levels. The measures would be triggered if the water level...

Republika Srpska accelerates generation and gas projects after drought curbs output

Energy and Mining Minister Petar Djokic said electricity production in Republika Srpska can normally run about 35% above domestic demand. He added that the buffer narrowed during summer due to dry weather cutting hydropower output. The Ugljevik thermal power...
Supported byVirtu Energy