Supported byClarion Energy
HomeSEE Energy NewsRomania: Solar power...

Romania: Solar power plants to be built in western Romania

In Turda, western Romania Enel X Romania, a local subsidiary of Italian Enel Group, will build a solar power plants for the retailer Kaufland.

The solar power plant, a project worth one million euros, will have installed capacity of 1 MW. The plant is expected to generate 1,277 MWh of electricity per year. The project includes the turnkey delivery of a system that consists of over 2,000 solar panels located on a plot of land in the vicinity of the Kaufland logistics center in Turda.

Enel X Romania’s portfolio includes solar projects implemented for companies in sectors such as food, retail, logistics centers, shopping centers, and office buildings.

 

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Romania delays Cernavodă restart amid Danube drought, extending nuclear outage

Romania is unlikely to restart either reactor at the Cernavodă nuclear plant for at least another 10 days, pushing recovery beyond mid-September. The delay extends the loss of around 1.3-1.4 GW of baseload generation and keeps Romania reliant on...

Rompetrol Rafinare boosts Petromidia storage capacity amid refinery upgrade

Rompetrol Rafinare is expanding storage capacity at its Petromidia refinery as part of a programme aimed at improving the flexibility and reliability of crude oil and fuel logistics. The company’s works include changes to tank capacity and refurbishment across...

Romania emergency Danube measures for cooling-water supply at Cernavoda

Three-stage plan tied to intake basin water level Romania has approved an emergency intervention plan aimed at maintaining cooling-water supplies for the Cernavoda nuclear power plant amid exceptionally low Danube levels. The measures would be triggered if the water level...
Supported byVirtu Energy