Supported byClarion Energy
HomeOilRomania: Rompetrol Rafinare...

Romania: Rompetrol Rafinare expects better financial results and increased export

After petrol product demand was significantly reduced in 2020 due to the coronavirus pandemic, this year the largest Romanian oil refiner Rompetrol Rafinare, a part of KMG International Group, is expecting better financial results based by the return of the demand for petroleum products.

Last year, Rompetrol Rafinare was the 15th largest exporter in Romania, but in 2021, the company expects an increase in exports by some 25 %. Petromidia refinery processed 1.265 million tons of raw materials in the first quarter of 2021, up from 1.24 million tons in the same period last year. The refinery’s utilization was 84 %, which is higher by more than 10 % compared to Q1 2020.

Refineries in Europe also expect better second quarter, although demand should remain below the 2019 level. Italian oil refiner Saras said that it expected the refining environment to improve in the second quarter of 2021, with gasoline crack spreads already rising sharply along with expectations of a stronger diesel market.

Rompetrol Rafinare recorded a net loss in the amount of 14.7 million dollars in the first quarter of 2021, which is significantly lower compared to a loss of 87.8 million dollars recorded in the same period last year. Revenues rose to one billion dollars in the January-March 2021 period, from 929 million dollars in the first quarter of 2020, mainly as a result of a slight increase in sales and a rise in gross refining margin.

 

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Rompetrol Rafinare boosts Petromidia storage capacity amid refinery upgrade

Rompetrol Rafinare is expanding storage capacity at its Petromidia refinery as part of a programme aimed at improving the flexibility and reliability of crude oil and fuel logistics. The company’s works include changes to tank capacity and refurbishment across...

Romania emergency Danube measures for cooling-water supply at Cernavoda

Three-stage plan tied to intake basin water level Romania has approved an emergency intervention plan aimed at maintaining cooling-water supplies for the Cernavoda nuclear power plant amid exceptionally low Danube levels. The measures would be triggered if the water level...

Romania becomes Southeast Europe’s battery-financing laboratory

Romania is moving beyond announcing battery projects and beginning to demonstrate how large-scale storage can actually be financed. August produced some of the clearest evidence yet. Econergy’s Părău 2 project secured a financing package of approximately €229 million from six banks and financial institutions. The...
Supported byVirtu Energy