Supported byClarion Energy
HomeElectricityNorth Macedonia mandates...

North Macedonia mandates solar systems for public buildings to boost energy efficiency

Public buildings in North Macedonia will soon be required to install solar systems, following recent amendments to the Energy Efficiency Law. The changes aim to harmonize national policy with EU standards, delivering both economic and regulatory benefits for citizens. Authorities expect the measures to lower energy bills, improve air quality, protect the environment, and create new green jobs. The Ministry of Energy considers the reform a significant step toward reducing overall energy consumption, cutting greenhouse gas emissions, and expanding the use of renewable energy.

A key principle being introduced is the EU’s “energy efficiency first” approach, which requires the public sector, energy companies, and consumers to prioritize the most cost-effective solutions to optimize energy use, including renewable-based technologies.

As part of a long-term strategy, residential, public, and commercial buildings will be modernized into highly efficient structures with near-zero energy consumption. Solar systems and other renewable technologies will play an essential role in this transformation. The annual energy savings target for public buildings will increase from 1 to 3 percent, and at least 3 percent of the total floor area of public buildings that fail to meet minimum energy performance standards will need to be renovated each year. By 2050, the goal is for all major building categories in the country to meet near-zero energy standards.

The government also plans to introduce targeted measures for final energy savings, with a focus on institutions and system operators. Energy auditors will be responsible for ensuring that efficiency policies are properly implemented and that targets are achieved.

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

North Macedonia generation drops 22% in July as renewables rise

North Macedonia’s gross electricity generation declined 22.3% year on year to 460,035 MWh in July, even as hydro and wind output increased. The month’s generation mix included higher contributions from hydropower and wind compared with the same period a...

Envision selected for turbines in Stip wind project first phase, North Macedonia

Alcazar Energy Partners has reached financial close for the Stip wind project in North Macedonia. The first phase totals 131.25 MW and has moved toward construction after securing financing and selecting Envision Energy as turbine supplier. The project is...

North Macedonia advances €119 million storage and grid upgrade as flexibility takes over from coal

North Macedonia is preparing a combined €119 million investment in battery storage and grid digitalisation, signalling a shift in the country’s energy transition from replacing coal generation toward building the flexibility and system-control capabilities needed to operate with a...
Supported byVirtu Energy