Supported byClarion Energy
HomeHydroGreece, EC has...

Greece, EC has approved the financial package intended for the project for the construction of 680 MW pump-storage hydropower plant Amfilohia

The European Commission (EC) has approved the financial package intended for the project for the construction of 680 MW pump-storage hydropower plant Amfilohia in northwestern Greece, developed by Terna Energy.

The construction of the HPP will be partially funded with a 250 million euros grant from Greek Recovery and Resilience Facility. According to the EC, the financial aid is necessary, while its level corresponds to the effective financing requirements. The positive effects of the measure outweigh any potential distortion of competition and trade brought about by the support.

The Amfilohia hydropower complex consists of two production units and three reservoirs. Total effective reservoir storage capacity is 7 million cubic meters, equivalent to 3.97 TWh. The Agios Georgios unit has 5 million cubic meters and it will work with four reversible Francis-type turbines of an overall 460 MW or 496 MW in pumping mode, compared to 2 million cubic meters and two turbines at Pyrgos with the capacity of 220 MW or 234 MW in pumping mode.

The project is also included in the list of European Projects of Common Interest (PCI).

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Greece approves €2.3bn programme for island grids, renewables and storage

Greece has secured approval for a €2.3 billion programme aimed at decarbonising its islands, with Athens directing more than €2 billion towards electricity interconnections, renewable generation and storage as it accelerates the replacement of oil-fired power. The approval was...

Metlen signs 10-year PPA for 12 MW Greek solar supply to Coca-Cola Tria Epsilon

Metlen Energy & Metals has signed a 10-year power purchase agreement to supply Coca-Cola Tria Epsilon with electricity from a new 12 MW solar project in Greece. The agreement is structured as a bilateral contract for long-term renewable power...

Greece wind buildout set to miss 2030 target despite faster 2026 additions

Greece accelerated wind-power construction in the first half of 2026, but projections indicate the country is still set to miss its 2030 capacity target. The outlook is based on figures cited in a document . Developers commissioned 321 MW...
Supported byVirtu Energy