Supported byClarion Energy
HomeElectricityCroatia: Market flexibility...

Croatia: Market flexibility boosted with increase in block limits for day-ahead and intraday auctions

Starting from January 8, with the first trading date on January 9, the maximum number of blocks per portfolio was increased from 6 to 40 for both the day-ahead market (DAM) and intraday auctions market (IDA). This change significantly enhances flexibility for market participants. For example, a member with two portfolios now has access to 80 blocks, up from the previous limit of 12. The volume value for each block remains unchanged at 500 MW.

This adjustment was made in response to member feedback and is intended to support the development of liquidity in IDAs, facilitate participation in DAM, and prepare for the upcoming introduction of 15-minute trading units (15MTU).

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

INA outlines plan to lift Croatia gas output via new well commissioning

Five 2026 wells to reverse declining production Croatian oil and gas company INA expects domestic natural-gas production to rise by around 10% after five new wells are commissioned in 2026. The additional output is intended to reverse several years of...

Acciona Energia commissions 72 MW Croatian wind under 12-year contracts for difference

Acciona Energia has commissioned 72 MW of wind capacity in Croatia under 12-year contracts for difference, expanding its operating footprint as it develops large-scale solar. The commissioning brings the company’s Croatian operating portfolio to 102 MW across three wind...

Croatia amends Electricity Market Act to expand aggregation, grid studies, and connection rights

Croatia’s amended Electricity Market Act entered into force on October 15, 2026, introducing changes that go beyond conventional electricity-market reform. The legislation reshapes the commercial roles for industrial flexibility, the preparation of grid-connection studies, and the duration of legacy...
Supported byVirtu Energy