Supported byClarion Energy
HomeGasBulgaria: United Bulgarian...

Bulgaria: United Bulgarian Bank to finance Bulgartransgaz network upgrade under Vertical Gas Corridor project

United Bulgarian Bank has been selected to provide a five-year credit facility for Bulgartransgaz, Bulgaria’s gas transmission system operator, to modernize its network as part of the Vertical Gas Corridor project. The loan will support efforts to enhance energy connectivity between Greece and Central Europe.

Despite Bulgartransgaz requesting €102 million, bids from major lenders—including Bank of America, ING, UniCredit Bulbank, and others—totaled €781.8 million, underscoring investor confidence in the project’s strategic importance. The winning bid featured an annual interest rate under 2%.

Launched in 2016 by Greece, Bulgaria, Romania, and Hungary, and later joined by Ukraine, Moldova, and Slovakia, the Vertical Gas Corridor aims to improve regional supply security and enable bidirectional natural gas flows across Europe.

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Bulgaria records 3.69 TWh net electricity export surplus through October 18, 2026

Bulgaria posted a net electricity export surplus of 3.69 TWh between January 1 and October 18, 2026. During the period, electricity output expanded faster than domestic consumption. Rising renewable generation contributed to offsetting lower production from coal and nuclear...

US extends Lukoil Bulgaria sanctions exemptions to April 2027

OFAC general licences extend operating room for Bulgarian assets The United States has extended sanctions exemptions covering Lukoil’s Bulgarian businesses until April 24, 2027. The measure provides additional time for operations at the Burgas refinery and related fuel businesses while...

Bulgartransgaz cancels €56 million Chiren production wells tender after bids exceed budget

Bulgarian gas transmission operator Bulgartransgaz has cancelled a €56 million procurement for new production wells at the Chiren underground gas storage facility. The cancellation followed an outcome in which the only financially evaluated offer exceeded the available budget. The...
Supported byVirtu Energy