Supported byClarion Energy
HomeElectricityBulgaria: February electricity...

Bulgaria: February electricity trade on IBEX

In February 2021 on the day-ahead market of the Independent Bulgarian Energy Exchange (IBEX) a total of 1,939,383 MWh of electricity was traded, which is 7.2 % less compared to the previous month. Average daily traded volume in February amounted to 69,263.7 MWh. Traded volume in February 2021 was 82.5 % higher compared to the same month last year. The average baseload price on the day-ahead market in February amounted to 46.83 euros/MWh, which is 12 % lower compared to December 2020 (53.22 euros/MWh), while average peak price was 53.71 euros/MWh (- 12.2 %). There were a total of 82 registered participants on the IBEX day-ahead market, one less compared to the previous month. Regarding intraday market, a total of 97,841.8 MWh (- 43.6 %) was traded, with the average weighted price of 49.52 euros/MWh (- 16 %).

 

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Bulgaria launches 300 MWh Tesla battery project as energy storage expansion gains momentum

Bulgaria has begun construction of a 300 MWh battery energy-storage facility in Tvarditsa, marking the first stage of a broader investment programme worth more than €350 million. The programme includes three battery projects with a combined storage capacity of...

Bulgaria records 3.69 TWh net electricity export surplus through October 18, 2026

Bulgaria posted a net electricity export surplus of 3.69 TWh between January 1 and October 18, 2026. During the period, electricity output expanded faster than domestic consumption. Rising renewable generation contributed to offsetting lower production from coal and nuclear...

US extends Lukoil Bulgaria sanctions exemptions to April 2027

OFAC general licences extend operating room for Bulgarian assets The United States has extended sanctions exemptions covering Lukoil’s Bulgarian businesses until April 24, 2027. The measure provides additional time for operations at the Burgas refinery and related fuel businesses while...
Supported byVirtu Energy