Supported byClarion Energy
HomeElectricityBulgaria, Electricity generation...

Bulgaria, Electricity generation dropped by 16 % in 2023

According to the data published by Bulgarian electricity transmission system operator ESO, production of electricity in Bulgaria in the period between 1 January and 19 March 2023 has decreased by 16.07 % compared to 2022 and reached 10.82 TWh.

Bulgaria’s electricity consumption also decreased in 2023, by 5.89 % reaching a total of 9.41 TWh. Surplus electricity amounted to 1.42 TWh in 2023, 51.2 % less than in 2022.

Baseload power plants (coal, nuclear) produced a total of 9.35 TWh of electricity in 2023, which is 15.9 % less than in 2022.

The share of electricity produced from renewable energy sources (RES) in the transmission network rose by 15.42 % to 393 GWh, while RES share in the country’s distribution network increased by 0.88 % to 466.2 GWh.

Sign up for updates & special reports

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Bulgaria launches 300 MWh Tesla battery project as energy storage expansion gains momentum

Bulgaria has begun construction of a 300 MWh battery energy-storage facility in Tvarditsa, marking the first stage of a broader investment programme worth more than €350 million. The programme includes three battery projects with a combined storage capacity of...

Bulgaria records 3.69 TWh net electricity export surplus through October 18, 2026

Bulgaria posted a net electricity export surplus of 3.69 TWh between January 1 and October 18, 2026. During the period, electricity output expanded faster than domestic consumption. Rising renewable generation contributed to offsetting lower production from coal and nuclear...

US extends Lukoil Bulgaria sanctions exemptions to April 2027

OFAC general licences extend operating room for Bulgarian assets The United States has extended sanctions exemptions covering Lukoil’s Bulgarian businesses until April 24, 2027. The measure provides additional time for operations at the Burgas refinery and related fuel businesses while...
Supported byVirtu Energy