Supported byClarion Energy
HomeHydroBosnia and Herzegovina,...

Bosnia and Herzegovina, HPP Visegrad produced 1,174 GWh of electricity in 2021

A subsidiary of power utility ERS “Hidroelektrane na Drini”, the company which operates hydropower plant Visegrad, announced that the plant has produced 132.11 GWh of electricity in December 2021, which is by 96.2 % higher compared to the previous month. Last December, the plant produced 67.87 GWh of electricity.

HPP Visegrad produced a total of 1,174 GWh of electricity in 2021, compared to 708.8 GWh produced in 2020. Highest 2021 monthly electricity production was recorded in January with 175.4 GWh.

HPP Visegrad was commissioned in 1989 and it has power output of 315 MW (3 x 105 MW) and average annual generation of 1,010 GWh of electricity. Record annual production was achieved in 2010 with 1,283.05 GWh.

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Republic of Srpska Plans Tighter Solar Rules After 3,064 Hectares Reclassified

Authorities in Bosnia and Herzegovina’s Republic of Srpska are preparing tighter restrictions on photovoltaic developments on agricultural land. The rapid expansion of solar power has contributed to the conversion of thousands of hectares of farmland. The entity’s agriculture ministry...

Federation of Bosnia electricity output rises 15.3% as coal production falls

Gross electricity production in the Federation of Bosnia and Herzegovina reached 534 GWh in September, up 15.3% from 463 GWh in September 2025. The rise came as domestic coal output continued to decline. Electricity generation increasingly relied on hydropower...

Bosnia’s August power output falls to 1,090 GWh as imports rise

Gross electricity generation in Bosnia and Herzegovina’s power sector totalled 1,090 GWh in August. That was down from 1,122 GWh a year earlier, as lower thermal output outweighed gains in hydropower and renewables. Thermal plants supplied 62.1% of gross...
Supported byVirtu Energy