Supported byClarion Energy
HomeSEE Energy NewsBosnia and Herzegovina,...

Bosnia and Herzegovina, ERS has launched a public call for obtaining a loan in the amount of 5.1 million euros

Bosnian state-owned power utility ERS has launched a public call for obtaining a loan in the amount of 5.1 million euros.

The loan will have a maturity of one year and it is expected that the costs of the loan would amount to some 230,000 euros.

The deadline for the submission of bids is 7 September.

 

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Bosnia and Herzegovina launches €32.3 million Bistrica grid tender

The Bistrica hydropower development in Bosnia and Herzegovina’s Republic of Srpska has opened a €32.3 million tender for infrastructure to connect its three planned plants to the transmission grid. The contract includes the Miljevina substation and lines linking the...

Republic of Srpska Plans Tighter Solar Rules After 3,064 Hectares Reclassified

Authorities in Bosnia and Herzegovina’s Republic of Srpska are preparing tighter restrictions on photovoltaic developments on agricultural land. The rapid expansion of solar power has contributed to the conversion of thousands of hectares of farmland. The entity’s agriculture ministry...

Federation of Bosnia electricity output rises 15.3% as coal production falls

Gross electricity production in the Federation of Bosnia and Herzegovina reached 534 GWh in September, up 15.3% from 463 GWh in September 2025. The rise came as domestic coal output continued to decline. Electricity generation increasingly relied on hydropower...
Supported byVirtu Energy