Supported byClarion Energy
HomeMiningSerbia mining: Erin...

Serbia mining: Erin Ventures prepares next development phase of boron Piskanja project

Erin Ventures announced that preparations are underway for the commencement of the 2017 work program on its 100% owned Piskanja boron project in Serbia. The completion of this work program will continue to advance the fundamentals of the Piskanja project, as well as ensure that Erin is compliant with its obligations in order to keep its exploration license in good standing.

The planned work for this program includes: diamond drilling of 2 holes, required to complete an infill 50 by 50 meter grid; the twining of 1 of Erin’s previous reverse circulation holes located on a 100 by 100 meter drill grid for a metallurgical testing bulk sample; 4 exploratory drill holes to evaluate the potential propagation of mineral bodies in the direction of some positive historical Rio Tinto drill holes to the western and southern extremities of the property; 1 drill hole on the 100 by 100 meter grid designed to be multi-purposed as a hydrogeological monitoring station as well as an exploration hole; 1 decline hole for structural engineering purposes; geochemical testing of the drill cores; continuation of ongoing hydrogeological monitoring; and, geophysical, geotechnical, mineralogical-petrological and metallurgical studies.

Subject to the availability of additional funds and adequate time in this exploration season, Erin is planning additional works on both Piskanja and its wholly owned, adjacent Jarandol license area.

This work program is designed to ensure that the project continues to comply with both the Canadian Institute of Mining “Best Practice Guidelines” and Serbian mine licensing and mine development regulations.

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

SEE power prices surge as demand rebounds and wind output declines

Electricity prices across Southeast Europe rose sharply on Monday, October 5, as the return of weekday demand coincided with weaker wind generation. Hungary recorded one of the region’s strongest price increases, widening its premium over Germany to €76.14/MWh. Hungary’s HUPX...

Bulgaria’s battery boom strengthens regional power position

Bulgaria’s installed battery storage capacity reached around 3.3 GW of power and 8.6 GWh of energy capacity by mid-2026, strengthening the country’s ability to absorb surplus solar generation and release electricity during periods of stronger demand. Most of the new...

Romania seeks to extend emergency power controls as supply risks persist

Romania is seeking to extend its emergency electricity-market powers through October 31, maintaining the option to restrict exports or limit industrial consumption if prolonged nuclear and hydropower constraints threaten security of supply. Under the proposed extension, transmission system operator Transelectrica...
Supported byVirtu Energy