Supported byClarion Energy
HomeNews Serbia EnergySEE Power Exchanges...

SEE Power Exchanges Trading for July 11th, 2016

On the Serbian day-ahead exchange SEEPEX on July 11th, 2016 (delivery date: July 12th, 2016) trading was carried out at the price of 42.68 EUR/MWh for daily baseload. Trading volume was 334.5 MWh.

Price of peak energy for daily peak load was at the level of 49.75 EUR per MWh and trading volume was 274.5 MWh.

On Croatian day-ahead power market CROPEX trading was carried out at the price of 44.84 EUR/MWh for daily baseload.

The price of peak energy for daily peak load was at the level of 54.62 EUR per MWh.

Total trading volume was 316.0 MWh.

On the Romanian day-ahead power market OPCOM trading was carried out at the price of 32.33 EUR/MWh for daily baseload.

The price of peak energy for daily peak load was at the level of 31.22 EUR per MWh. Trading volume was 33,727.1 MWh.

During off-peak hours the price was 33.44 EUR per MWh, and trading volume was 30,896.1 MWh.

On Hungarian day-ahead power market HUPX trading was carried out at the price of 45.70 EUR per MWh for daily baseload.

The price of peak energy for daily peak load was at the level of 55.61 EUR per MWh.

Total trading volume was 54,727.4 MWh.

On Bulgarian exchange IBEX the price for baseload was 34.62 EUR per MWh.

The price of peak energy was 41.81 EUR per MWh, and trading volume: 3,457.4 MWh.

During off-peak hours the price was 27.44 EUR per MWh, and trading volume was 3,820.9 MWh.

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

SEE electricity markets: Serbia leads regional prices as Hungarian-German spread widens and import dependence persists

Southeast European electricity markets remained under significant price pressure for delivery on 13 October, with Serbia recording the highest day-ahead price among the regional markets covered, while a widening premium between Hungary and Germany highlighted persistent constraints on electricity...

Romania reviews Doicești SMR after internal check leaves over 80% conditions unresolved

Romania’s nuclear power utility Nuclearelectrica is reassessing the future of the Doicești small modular reactor project following an internal review. The review concluded that more than 80% of the conditions linked to its February 2026 investment decision remained unresolved....

CGES approves €40 million grid deal for 488 MW Sinjajevina wind connections

High-voltage link for Sinjajevina 1 and Sinjajevina 2 Montenegro’s electricity transmission operator CGES has approved an arrangement covering approximately €40 million of high-voltage infrastructure to connect two wind farms with a combined capacity of 488 MW. The plan is aimed...
Supported byVirtu Energy