Supported byClarion Energy
HomeSEE Energy NewsRomania: Polish solar...

Romania: Polish solar producer R.Power to build 23 MW of solar projects

Polish solar energy producer R.Power has announced contracts for the construction of 23 MW of solar power plants in Romania. The agreements, signed with Polish firm Nomad Electric and Romanian renewable energy developer Waldervar, involve shovel-ready projects located in central and eastern Romania. These solar power plants will be connected directly to the national medium-voltage network and are expected to be operational by the second quarter of 2025.

R.Power is expanding its footprint in Romania, Italy, Portugal, Spain, and Germany. The company aims to develop a solar portfolio of 100 MW in Romania by the end of 2025, with a global goal of reaching 1 GW of operational capacity next year. Earlier this year, R.Power secured a pipeline of over 200 MW with various solar projects across Romania, all of which have obtained necessary permits and network connections.

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Rompetrol Rafinare boosts Petromidia storage capacity amid refinery upgrade

Rompetrol Rafinare is expanding storage capacity at its Petromidia refinery as part of a programme aimed at improving the flexibility and reliability of crude oil and fuel logistics. The company’s works include changes to tank capacity and refurbishment across...

Romania emergency Danube measures for cooling-water supply at Cernavoda

Three-stage plan tied to intake basin water level Romania has approved an emergency intervention plan aimed at maintaining cooling-water supplies for the Cernavoda nuclear power plant amid exceptionally low Danube levels. The measures would be triggered if the water level...

Montenegro’s renewable boom reaches the grid-connection test

Montenegro has accumulated a large pipeline of proposed solar and wind projects, but August reinforced that the decisive development constraint is shifting toward the transmission system. CGES and Nu Energy signed the grid-connection agreement for the Velestovo project, one of the country’s more advanced...
Supported byVirtu Energy