Supported byClarion Energy
HomeElectricityRomania opens new...

Romania opens new wind farm auction after previous tender falls short of 2 GW target

Romania’s Ministry of Energy has announced a new call for expressions of interest from developers to include additional wind farms in the upcoming Contracts for Difference (CfD) auction. This follows the previous tender, which awarded just 1.26 GW of wind capacity out of a 2 GW target.

The Ministry is targeting projects that are sufficiently advanced but were unable to participate in the last round due to tight deadlines. After reviewing market feedback, authorities will determine the total auctioned volume and may adjust the quota if sufficient eligible interest is received.

In the previous auction, a maximum strike price of 80 euros/MWh was set for a 15-year period. All winning bids came in below this ceiling, with the lowest accepted offer at 65.17 euros/MWh and the largest approved project sized at 211 MW.

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Romania extends 25% diesel excise reduction until Oct. 31

Romania will keep a 25% reduction in diesel excise duty until Oct. 31, extending temporary relief for transport operators and other businesses. The decision follows a period in which international fuel-market prices have risen faster than domestic pump prices....

R.Power completes 55-MW Lazuri solar plant in Romania; grid link by end-2026

Polish renewable-energy developer R.Power has finished construction of the 55-MW Lazuri solar plant in Romania’s Satu Mare county. Grid connection is expected before the end of 2026. The project is forecast to produce around 70 GWh annually, equivalent to...

Transelectrica to invest over €2.25bn in Romania grid upgrades through 2035

Romanian transmission system operator Transelectrica plans to invest more than €2.25 billion between 2026 and 2035 as part of a ten-year grid programme. The plan prioritises international interconnectors, completion of the domestic 400-kV transmission ring, and renewable integration. The...
Supported byVirtu Energy