Supported byClarion Energy
HomeGasRomania, EC includes...

Romania, EC includes second stage of BRHA gas pipeline into PCI list

Last week, the European Commission (EC) has approved the fifth list of Projects of Common Interest (PCI) in the field of trans-European energy infrastructure, a list that includes several projects in Romania, most notably the second phase of the BRHA (Bulgaria-Romania-Hungary- Austria) gas pipeline project.

In the natural gas sector, among the projects involving Romania and which are included on the fifth PCI list are: Depomures underground gas storage, Bilciuresti underground gas storage and the second phase of BRHA gas pipeline.

This second stage includes the expansion of transport capacity in Romania towards Hungary, ensuring the physical possibility of permanent bidirectional flow between Romania and Hungary, by building a compression station at Csanadpalota on the Hungarian side.

Several projects related to the transportation of natural gas from Black Bea to the main BRHA route are included as well: Tarmul Marii Negre (Black Sea Coast) – Podisor pipeline.

he list also includes projects for the construction of electricity interconnection between Romania and Serbia (Resita-Pancevo overhead transmission line), as well as overhead transmission line from HPP Iron Gates (Djerdap) to Resita, overhead transmission line between Resita and Timisoara and overhead transmission line between Arad and Timisoara.

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Rompetrol Rafinare boosts Petromidia storage capacity amid refinery upgrade

Rompetrol Rafinare is expanding storage capacity at its Petromidia refinery as part of a programme aimed at improving the flexibility and reliability of crude oil and fuel logistics. The company’s works include changes to tank capacity and refurbishment across...

Romania emergency Danube measures for cooling-water supply at Cernavoda

Three-stage plan tied to intake basin water level Romania has approved an emergency intervention plan aimed at maintaining cooling-water supplies for the Cernavoda nuclear power plant amid exceptionally low Danube levels. The measures would be triggered if the water level...

Romania becomes Southeast Europe’s battery-financing laboratory

Romania is moving beyond announcing battery projects and beginning to demonstrate how large-scale storage can actually be financed. August produced some of the clearest evidence yet. Econergy’s Părău 2 project secured a financing package of approximately €229 million from six banks and financial institutions. The...
Supported byVirtu Energy