Romania hits record electricity...

On December 4, Romania reached a new record for electricity imports, surpassing 3,000...

Romania: Depogaz awards €50...

Depogaz, a subsidiary of the Romgaz group and Romania's largest operator of underground...

Romania: Natural gas prices...

Starting on January 1, 2025, suppliers will no longer be able to purchase...

Greece: Renewable energy investors...

Investors in the renewable energy sector are increasingly prioritizing projects that integrate energy...
Supported byClarion Energy banner
HomeNews Serbia EnergyDesign, permitting and...

Design, permitting and technical project management for industrial facilities in Serbia, Owners Engineer role

The design, permitting and technical project management of industrial facilities in Serbia involve a structured process guided by national regulations and standards. A key player in this process is the Owner’s Engineer, a consultant or firm representing the owner’s interests throughout the project lifecycle to ensure alignment with project goals. Here’s a detailed overview of these stages and the responsibilities of the Owner’s Engineer.

1. Design of industrial facilities in Serbia

The design phase for industrial facilities—including manufacturing plants, warehouses and energy projects—requires extensive planning and engineering expertise to ensure compliance with Serbian regulations and operational efficiency.

Key design stages:

  • Conceptual design:
    • This initial stage establishes the facility’s purpose, layout, and basic specifications. Decisions regarding location, capacity and production processes are made.
    • The conceptual design must adhere to industry standards and the owner’s operational goals. The Owner’s Engineer ensures alignment with best practices and local and international standards.
  • Preliminary design:
    • This stage involves detailed technical drawings and engineering studies (structural, mechanical, electrical and civil engineering).
    • It includes layouts, equipment placement, utility requirements and waste management systems. The Owner’s Engineer reviews these designs to ensure feasibility, sustainability and regulatory compliance.
  • Detailed design:
    • The detailed design phase specifies every aspect of the facility’s construction, including material specifications and building methods.
    • The Owner’s Engineer reviews and approves detailed designs, ensuring technical soundness and performance expectations are met.

Design documentation:

  • Architectural plans: Layout and dimensions.
  • Engineering plans: Detailed drawings of structural, electrical, mechanical and plumbing systems.
  • Technical specifications: Standards for materials and construction methods.
  • Environmental and safety plans: Compliance with environmental regulations and worker safety.

2. Permitting process in Serbia

Before construction, various permits must be obtained from local and national authorities. The permitting process is overseen by the Ministry of Construction, Transport and Infrastructure, local municipalities, and specialized agencies.

Key permitting stages:

  • Location Permit:
    • The first permit to be obtained, confirming that the site is suitable for industrial use based on urban planning and zoning laws. The Owner’s Engineer ensures the site meets planning requirements and manages interactions with local authorities.
  • Construction Permit:
    • Following the location permit, a Construction Permit is required, necessitating the submission of detailed project documentation, including architectural plans and environmental assessments. The Owner’s Engineer oversees this submission to ensure completeness and compliance with building codes.
  • Utility Permits:
    • Separate permits for connecting utilities like electricity, gas, water and sewage systems are required. The Owner’s Engineer coordinates with utility providers for timely approval and proper system integration.
  • Environmental Permits:
    • Depending on the industrial activity, an Environmental Permit may be required, often linked to an Environmental Impact Assessment (EIA). The Owner’s Engineer ensures the design complies with environmental regulations and collaborates with environmental consultants.
  • Operation Permit:
    • After construction, an Operation Permit is necessary to commence facility operations, which involves inspections for compliance with approved plans and safety regulations. The Owner’s Engineer oversees final inspections and manages documentation handover.

3. Technical project management

Managing industrial facilities encompasses overseeing design, permitting and construction to ensure timely, budget-friendly, and compliant project completion.

Key components of technical project management:

  • Project scheduling and planning:
    • A detailed timeline is developed, outlining milestones from design completion to commissioning. The Owner’s Engineer ensures the schedule accounts for realistic timelines regarding regulatory approvals and construction phases.
  • Cost management:
    • The project manager monitors the budget, overseeing procurement and construction contracts. The Owner’s Engineer advises on cost-saving opportunities while maintaining project quality and compliance.
  • Quality control and compliance:
    • Throughout construction, the Owner’s Engineer monitors work quality to ensure it meets approved designs and industry standards, conducting inspections and material testing.
  • Risk management:
    • Identifying potential project risks (e.g., permitting delays, supply chain issues) is crucial. The Owner’s Engineer implements contingency plans to mitigate these risks.
  • Health, safety and environmental (HSE) management:
    • Ensuring adherence to safety and environmental regulations during construction is essential. The Owner’s Engineer oversees compliance with safety protocols throughout the project.

4. Owner’s Engineer role

The Owner’s Engineer acts as an independent advisor and representative of the project owner, ensuring all stages meet expectations, legal requirements and industry best practices.

Responsibilities of the Owner’s Engineer:

  • Design review:
    • The Owner’s Engineer ensures designs are technically sound, cost-effective, and compliant with standards, reviewing all design phases for alignment with project objectives.
  • Permitting oversight:
    • The Owner’s Engineer manages the permitting process, coordinating with authorities to secure necessary permits and ensuring all documentation complies with Serbian law.
  • Tendering and procurement:
    • Assisting in the tendering process, the Owner’s Engineer evaluates bids and recommends contractors based on technical and financial criteria.
  • Construction supervision:
    • During construction, the Owner’s Engineer monitors progress, ensuring compliance with approved plans and addressing any technical issues that arise.
  • Commissioning and handover:
    • Overseeing the commissioning phase, the Owner’s Engineer ensures all systems function correctly before final handover to the owner, verifying performance standards.

Conclusion

The design, permitting and management of industrial facilities in Serbia are intricate processes involving multiple stages and regulatory requirements. The Owner’s Engineer plays a vital role in overseeing the technical and regulatory aspects of the project, serving as an independent advisor. Key responsibilities include:

  • Design review: Ensuring compliance with industry standards.
  • Permitting oversight: Managing the acquisition of all necessary permits.
  • Tendering and procurement: Assisting in the selection of qualified contractors.
  • Construction supervision: Monitoring on-site work for compliance.
  • Commissioning and handover: Ensuring operational readiness before handover.

By effectively managing these tasks, the Owner’s Engineer mitigates risks, maintains quality and ensures the successful completion of industrial facilities in Serbia.

Powered by
www.clarion.energy
www.owners.engineer

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Serbia: EPS to complete turbine refurbishment at Bajina Basta hydropower plant

Serbian Minister of Mining and Energy, Dubravka Djedovic, announced that state-owned power utility EPS is expected to complete the refurbishment of the first turbine at its pump-storage hydropower plant Bajina Basta by December. Work on the second turbine will...

Serbia lifts 35-year moratorium on nuclear power plant construction, exploring new energy partnerships

Serbia has officially lifted its 35-year moratorium on the construction of nuclear power plants, marking a pivotal shift in the country’s energy strategy. The Energy Law, passed without debate in the Serbian Parliament due to a packed agenda, clears...

Serbia: SEEPEX reports 9.2% drop in November 2024 day-ahead market volume

In November 2024, the Serbian energy exchange SEEPEX reported a total of 494,395.3 MWh of electricity traded on the day-ahead market, marking a 9.2% decrease compared to October. The average daily traded volume for the month was 16,479.8 MWh....
Supported bySEE Mining News
error: Content is protected !!