St. Petersburg talks extend Russian gas deliveries to RS
Energy cooperation between the Republic of Srpska (RS) and Russia is set to continue after talks...
Serbia has secured an extension of its current natural gas supply arrangement, with deliveries continuing for an additional three months beyond the end of...
Battery storage can make renewable electricity more predictable for Serbian exporters and improve the commercial case for renewable projects. It does not reduce embedded emissions by itself or replace CBAM evidence requirements.
Around 2 GW of battery storage connection agreements were reported in Serbia in 2026, but the first standalone projects still need to establish a local financing template. EMS requires a construction bank guarantee before transmission-connected projects can advance to connection contracts.
Battery operators across Southeast Europe are increasingly buying solar-heavy midday electricity and shifting it for sale in later hours, with Bulgaria leading the trend. Serbia has begun recording negative day-ahead prices, which can provide a variable source of low-cost electricity for storage.
North Macedonia is structuring its planned 100 MW / 400 MWh Bitola battery as strategic grid infrastructure, with an estimated cost of EUR 98 million. The EBRD is considering a sovereign-guaranteed loan of up to EUR 33.1 million, alongside other expected financing.
Serbian industrial companies must weigh owning batteries against buying flexibility as a service. The choice depends on whether factory-specific savings or market optimisation provides most of the battery’s value.