HomeTagsCoal subsidies

coal subsidies

Supported byClarion Owners Engineers
Supported byClarion Owners Engineers
Supported byspot_img

Bosnia and Herzegovina: RiTE Ugljevik’s urgent loan tender

TPP Ugljevik provides about a third of electricity in the Republic of Srpska. Coalmine and thermal power plant (RiTE) Ugljevik, a subsidiary of Bosnian power...

Serbia: Subsidies for coal sector

In 2018, Serbia had direct subsidies in the amount of 47.4 million euros, while in 2019 that amount was 41.36 million euros, i.e. a...

Region: EnC calls on close inspection of coal subsidies of contracting parties

The new published study of the Energy Community (EnC) Secretariat from December 2020 is built on a previous analysis covering 2015-2017 on coal subsidies...

Serbia: A loan for Resavica coalmine

The state-owned mining company will sign an 8.5 million euros loan with the Czech bank in order to finance equipment procurements, said Serbian Minister...

Region: Coal subsidies between 2015 and 2019

In the period between 2015 and 2019 subsidies were the highest in Ukraine, Serbia and Bosnia and Herzegovina.  Contracting parties channeled more than 900...

Latest news

SEE electricity prices decline as renewable output increases and Italy’s premium widens

Electricity prices across southeastern Europe declined for September 30 delivery as forecasts pointed to stronger wind and solar generation and lower demand, reducing the...

Gazprom gas extension talks in Serbia as NIS sanctions deadline nears

Serbia expects to extend its gas supply arrangement with Gazprom beyond September 30 while Russian deliveries continue. President Aleksandar Vučić said after a call...

Serbia targets early-2027 start for Romanian gas interconnector construction

Serbia expects construction of its gas interconnector with Romania to begin in early 2027, creating an import route intended to diversify supply and strengthen...

Lukoil appoints Eugene Maniakhine to oversee Petrotel refinery restructuring

Lukoil has appointed Eugene Maniakhine to oversee the restructuring of its Petrotel refinery in Romania. The facility entered insolvency proceedings in August 2026 after...

North Macedonia aims for 38% renewables share by 2030

North Macedonia is targeting 38% renewable energy as a share of gross final energy consumption by 2030. The programme includes rapid solar expansion and...