Supported byClarion Energy
HomeMiningSerbia mining: Erin...

Serbia mining: Erin Ventures Canada completes drilling on its Jarandol boron exploration project

Erin Ventures Inc Canada reported on the completion of 2015 planned exploration program on its 100% owned Jarandol Basin Exploration License.

This phase included 8 exploratory vertical diamond drill holes totaling 2,723.8 meters.

The completion of this drill program has fulfilled Erin’s license obligations with the Serbian authorities, regarding the renewal of its Jarandol exploration license.

The Jarandol License covers a 35 km2 area directly adjacent to, and between, Erin’s 100% owned Piskanja boron project (covering 3 km2) on the eastern edge of the Jarandol Basin, and the Serbian government owned Pobrdje Boron Mine, some 2.5 km away from Piskanja on the opposite edge of the Jarandol Basin.

Jarandol has the potential to host extensions to both the Piskanja and the Pobrdje boron deposits, and/or the potential to host separate, similar boron deposits, transmits Serbia-energy.eu

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Southeast Europe power prices drop on Saturday, but evening peaks stay above €250/MWh

Electricity baseload prices fell by more than 20% across several Southeast European markets for Saturday delivery. Despite the decline, evening prices still rose above €250/MWh, indicating that flexibility remains priced into the most constrained hours. The day-ahead figures show...

Croatia extends winter price support for household electricity, gas and heating

Winter support period and budget allocation Croatia is spending about €170 million to keep household electricity, gas and heating costs below market levels during winter. The programme is designed to shield consumers from wholesale volatility while delaying a return to...

Kapino Polje solar complex expands EPCG generation near Nikšić to about 40 MW

Construction progress on L1, L2 and B1 sections Work has started on the Kapino Polje project near Nikšić, with activity under way on the L1, L2 and B1 sections. The combined scope for these sections represents around 20 MW. Support...
Supported byVirtu Energy