Supported byClarion Energy
HomeNews Serbia EnergySEE Power Exchanges...

SEE Power Exchanges Trading for July 19th

On the Serbian day-ahead exchange SEEPEX on July 19th, 2016 (delivery date: July 20th, 2016) trading was carried out at the price of 34.52 EUR/MWh for daily baseload. Trading volume was 942.3 MWh.

Price of peak energy for daily peak load was at the level of 38.29 EUR per MWh and trading volume was 333.7 MWh.

On Croatian day-ahead power market CROPEX trading was carried out at the price of 37.58 EUR/MWh for daily baseload.

The price of peak energy for daily peak load was at the level of 41.73 EUR per MWh.

Total trading volume was 480 MWh.

On the Romanian day-ahead power market OPCOM trading was carried out at the price of 34.1 EUR/MWh for daily baseload.

The price of peak energy for daily peak load was at the level of 36.99 EUR per MWh. Trading volume was 30,048.9 MWh.

During off-peak hours the price was 31.21 EUR per MWh, and trading volume was 29,495.6 MWh.

On Hungarian day-ahead power market HUPX trading was carried out at the price of 37.78 EUR per MWh for daily baseload.

The price of peak energy for daily peak load was at the level of 43.13 EUR per MWh.

Total trading volume was 52,888.8 MWh.

On Bulgarian exchange IBEX the price for baseload was 28.37 EUR per MWh.

The price of peak energy was 31.46 EUR per MWh, and trading volume: 3,767.1 MWh.

During off-peak hours the price was 25.27 EUR per MWh, and trading volume was 3,611.2 MWh.

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Nocaj’s 72 MWh battery can improve Serbian exporters’ CBAM readiness

Battery storage can make renewable electricity more predictable for Serbian exporters and improve the commercial case for renewable projects. It does not reduce embedded emissions by itself or replace CBAM evidence requirements.

Serbia’s around 2 GW battery agreements face financing test

Around 2 GW of battery storage connection agreements were reported in Serbia in 2026, but the first standalone projects still need to establish a local financing template. EMS requires a construction bank guarantee before transmission-connected projects can advance to connection contracts.

Bulgaria’s battery fleet exceeds 6 GW as solar shifts to storage

Battery operators across Southeast Europe are increasingly buying solar-heavy midday electricity and shifting it for sale in later hours, with Bulgaria leading the trend. Serbia has begun recording negative day-ahead prices, which can provide a variable source of low-cost electricity for storage.
Supported byVirtu Energy