Supported byClarion Energy
HomeSEE Energy NewsRomania: R.Power begins...

Romania: R.Power begins construction on first solar project, expanding capacity to 100 MW by 2026

Polish solar developer and independent power producer R.Power has announced the commencement of construction on its first solar project in Romania. The project will consist of four solar parks, with a combined capacity exceeding 23 MW, located in the communes of Stalpu, Suseni, Punghina, and Dudesti. These facilities are expected to be operational between the last quarter of 2025 and the first quarter of 2026.

Nomad Electric and Waldevar will provide the engineering, procurement, and construction (EPC) services for the project. This initiative is part of R.Power’s larger strategy to expand its solar capacity in Romania, with a target of reaching 100 MW by the end of 2026. In March, the company secured a pipeline of over 200 MW of solar projects across Romania, all with permits and network connections in place.

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Romania extends energy emergency by 30 days amid winter supply risks

Romania extended emergency measures as nuclear outages tighten the power balance ahead of winter. The winter programme covers 1 November 2026 to 31 March 2027.

Romania pairs Neptun’s 8 bcm gas target with solar and storage

Romania is expanding Black Sea gas production while adding utility-scale solar and battery storage. Neptun Deep could nearly double domestic gas output and create export capacity for neighbouring markets.

GECO proposes €22.1 billion Black Sea electricity corridor

The proposed corridor would connect Azerbaijan and Georgia with Romania and Hungary through three submarine cables, targeting transfers of up to 20 TWh a year to the EU. Transmission and dedicated renewable generation are estimated to cost about €22.1 billion combined.
Supported byVirtu Energy