Supported byClarion Energy
HomeAppSerbiaPower utility EPS,...

Power utility EPS, tender: “Justifiability Study with conceptual design of reconstruction in order to extend the operational life and increase of the block 4 (308.5 MW ) in TPP Nikola Tesla A”

“Electric Power Industry of Serbia” has announced a public procurement for the drafting of the “Justifiability Study with conceptual design of reconstruction in order to extend the operational life and increase of the block 4 (308.5 MW of power) in TPP Nikola Tesla A”.

Tender documents for the procurement procedure, as well as the invitation to tender can be found on the official website of EPS, www.eps.rs. The deadline for submission of bids is February 13th, until 11:00 AM.

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

SEE electricity prices decline as renewable output increases and Italy’s premium widens

Electricity prices across southeastern Europe declined for September 30 delivery as forecasts pointed to stronger wind and solar generation and lower demand, reducing the region’s net import requirement. Italy largely bucked the trend, widening its price premium over neighbouring...

Gazprom gas extension talks in Serbia as NIS sanctions deadline nears

Serbia expects to extend its gas supply arrangement with Gazprom beyond September 30 while Russian deliveries continue. President Aleksandar Vučić said after a call with Russian President Vladimir Putin that an annex should be signed shortly. The extension’s duration,...

Serbia targets early-2027 start for Romanian gas interconnector construction

Serbia expects construction of its gas interconnector with Romania to begin in early 2027, creating an import route intended to diversify supply and strengthen network resilience. Procurement for the Serbian section is expected to start shortly. Most technical and...
Supported byVirtu Energy