Supported byClarion Energy
HomeElectricityBulgaria: 25 MW...

Bulgaria: 25 MW BESS goes live

Austria’s Renalfa IPP has started commercial operation at its 25 MW/55 MWh battery energy storage system (BESS) located in the city of Razlog, southwestern Bulgaria.

The system, which is connected to the transmission network and located alongside a 33 MW solar plant, successfully went live at the start of the month. Renalfa IPP said the facility is the largest operating BESS system in Bulgaria and one of the first of such scale in Eastern Europe.

The facility is being managed and optimized by KER Toki Power, a fully digital Bulgarian electricity trader. The system participates in capacity and balancing markets via the trader’s platform, providing automatic Frequency Restoration Reserve (aFRR) and manual Frequency Restoration Reserve (mFFR) services to the grid.

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Bulgaria records 3.69 TWh net electricity export surplus through October 18, 2026

Bulgaria posted a net electricity export surplus of 3.69 TWh between January 1 and October 18, 2026. During the period, electricity output expanded faster than domestic consumption. Rising renewable generation contributed to offsetting lower production from coal and nuclear...

US extends Lukoil Bulgaria sanctions exemptions to April 2027

OFAC general licences extend operating room for Bulgarian assets The United States has extended sanctions exemptions covering Lukoil’s Bulgarian businesses until April 24, 2027. The measure provides additional time for operations at the Burgas refinery and related fuel businesses while...

Bulgartransgaz cancels €56 million Chiren production wells tender after bids exceed budget

Bulgarian gas transmission operator Bulgartransgaz has cancelled a €56 million procurement for new production wells at the Chiren underground gas storage facility. The cancellation followed an outcome in which the only financially evaluated offer exceeded the available budget. The...
Supported byVirtu Energy