Supported byClarion Energy
HomeSEE Energy NewsAlbania’s solar-plus-storage projects...

Albania’s solar-plus-storage projects reduce dry-year import exposure

Albania’s solar-plus-storage development is directly relevant to electricity trading because the country’s market vulnerability is hydrology. In wet years, Albania’s hydropower-heavy system can produce low-carbon electricity at scale. In dry years, the country becomes exposed to imports, often at unfavourable regional prices. Fortis Energy’s Ersekë Solar Power Plant, with 75 MW DC of solar capacity and a 25 MWh battery energy storage system, offers a practical response to that exposure.

The project is expected to generate around 135 GWh annually. Its size will not transform Albania’s entire power balance, but its structure is important. Solar alone would reduce daytime import needs. Solar paired with storage can shift part of that production into higher-value periods, support grid stability and provide some protection against short-term market volatility.

For traders, Albania is a hydrology-linked optionality market. When reservoirs are strong, import demand falls and export potential rises. When reservoirs weaken, Albania must buy into regional markets, often competing with other Balkan buyers during heatwaves, droughts or winter tightness. Storage-backed solar reduces the severity of that swing.

The project also creates a template for future Albanian PPAs. Industrial buyers, suppliers and traders can structure products around solar output with limited firming from batteries. As storage capacity grows, Albania can move from passive import exposure toward more active short-term optimisation.

The wider regional context matters. Albania is also entering long-term LNG contracting through ALBGAZ and AKTOR, suggesting that the country is trying to build several hedges at once: gas optionality, solar diversification and storage-backed flexibility. For a market historically dominated by hydrology, this is a significant shift.

The key limitation is scale. A 25 MWh battery provides useful flexibility, but not full seasonal protection. Albania will still need interconnections, reservoir management, possible gas-fired balancing and larger storage assets. Ersekë is best viewed as an early trading hedge against dry-year exposure. It shows the direction of travel: Albania’s future power market will be built around managing hydrology risk, not simply accepting it.

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

CBAM redefines Balkan electricity trading through carbon costs and credit risk

Import margins now depend on more than the difference between two wholesale electricity prices. Emissions treatment, transmission evidence and the liquidity required to carry carbon exposure through settlement are becoming central elements of the economics of cross-border power trading. Electricity...

Albania: ALPEX electricity trading surges 76% in September amid regional market expansion

Electricity trading on the Albanian Power Exchange (ALPEX) increased sharply in September 2026, highlighting the continued development of organised wholesale electricity markets in Albania and the wider Southeast European region. Despite the strong annual growth, monthly trading activity declined...

Dalekovod secures €19.88 million contract for underground Tirana high-voltage substation

Contract award for Tirana Center substation Croatian power infrastructure company Dalekovod has secured a €19.88 million contract to develop a new underground high-voltage substation in Tirana, Albania. The facility is part of Southeast Europe’s expanding electricity transmission and distribution investment...
Supported byVirtu Energy