Supported byClarion Energy
HomeMiningAir pollution increased...

Air pollution increased in Bor, Serbia due to arrival of a Chinese Zijin

According to the regulations, sulfur dioxide (SO2) in one measuring station can be exceeded only three days a year. This has not been respected in city of Bor for years. Analysis shows that with the privatization of RTB Bor (gold copper mine) at the end of 2018, pollution has increased in this city.

 

The mesuring station in Bor’s city park, just five minutes from the entrance to the mining basin, records exceedances of sulfur dioxide (SO2) in the air for years. Thus, in 2014, the average pollution period was five months, to be reduced to 13 days by 2018, and then jumped to 40 days after the Chinese investment, according to the Environmental Protection Agency (SEPA).

Whether lasting 13 or 40 days, high concentrations of pollutants affect the health of Bor residents.

The findings of the Bor Institute for Mining and Metallurgy’s report for 2018 show that in those years the concentrations of SO2 and harmful PM10 particles were higher than allowed, which could have contributed to blood and respiratory diseases. In 2018, arsenic in Bor was 24 times more than allowed. In many places, pollution in Serbia is above the legal limit.

About two-thirds of pre-school children and half of those under 18 in Bor, who in 2014-2018 needed the help of a doctor, had problems with their respiratory organs. They were most commonly affected by the sore throat and tonsils, which is the second most common disease in adults, with nine cases in every 100 inhabitants.

Although dominant, these diseases have a slight downward trend over the five-year period, coupled with declining production of the mining basin and a decrease in air pollution.

After the privatization of RTB Bor, pollution increased again.

Due to the release of hazardous substances into the air, the Ministry of Environmental Protection has initiated several lawsuits against Zijin Bor Copper.

Source: cins.rs

Supported byClarion Owners Engineers
Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Djerdap 3 pumped-storage: Bechtel-Enka qualifies as Serbia prepares planning

Serbia has advanced work on the proposed Djerdap 3 pumped-storage hydropower project, with a Bechtel-Enka consortium qualifying for the next stage of government negotiations. At the same time, a Serbian engineering consortium is preparing the project’s planning framework. The...

Domestic industrial PPAs open new revenue opportunities for Serbian and Montenegrin renewables

Domestic industrial demand can support renewable investment and improve electricity cost predictability, but the carbon value of a power purchase agreement depends on the products being exported and the emissions rules governing them. Renewable developers in Serbia and Montenegro have...

Serbian renewable projects face new contractual challenges on the Hungary export corridor

Export PPAs can expand market access for wind and solar projects, but the revenue ultimately reaching developers depends on delivery rights, trading costs and the share of output that qualifies for actual-emissions treatment. Serbian wind and solar developers targeting Hungarian...
Supported byVirtu Energy