Romania: INVL Renewable Energy...

INVL Renewable Energy Fund I, managed by INVL Asset Management and focused on...

Croatia: Summary of Guarantees...

On 29 July, a total of 231,827 Guarantees of Origin (GOs) were sold...

Bulgaria: TPP Maritsa 3...

Bulgarian thermal power plant Maritsa 3 reported a net loss of €2.7 million...

Bulgaria: Bobov Dol thermal...

The Bulgarian thermal power plant Bobov Dol posted a net profit of approximately...
HomeTagsHSE

Tag: HSE

Supervision of works in construction of energy facilities in Serbia, integrating Owners Engineering

The supervision of works in constructing energy facilities in Serbia is vital for ensuring projects comply with design specifications, regulatory requirements, and contractual obligations....

Design, permitting and technical project management for industrial facilities in Serbia, Owners Engineer role

The design, permitting and technical project management of industrial facilities in Serbia involve a structured process guided by national regulations and standards. A key...

Grid compliance test and grid connection of wind parks in Serbia, procedures and process integration 

The supervision of works in the construction of energy facilities in Serbia, coupled with the role of the Owner’s Engineer, is essential for ensuring...

Bosnia and Herzegovina: RiTE Ugljevik plans €15.5 million share issuance to settle debt with Slovenian HSE and address accumulated losses

The management of the thermal power plant and coalmine (RiTE) Ugljevik, a subsidiary of the state-owned power utility Elektroprivreda Republike Srpske (ERS), is planning...

Slovenia: HSE fully repays 492-million-euro capital funding

Holding Slovenske Elektrarne (HSE) has repaid 492-million-euro capital funding received from sovereign holding company SDH in December 2022, SDH said in a statement. HSE has...

Slovenia: TEŠ and the Velenje coal mine could be closed before the planned deadline

Slovenian Prime Minister Robert Golob said that the coal-fired thermal power plant Šoštanj and its mine Velenje may end operations before the expected closure...
error: Content is protected !!