Hidroelektrane na Drini, a subsidiary of power utility ERS and operator of the Visegrad Hydropower Plant (HPP), reported a significant increase in electricity production...
Hidroelektrane na Drini, a subsidiary of power utility ERS and the operator of the Višegrad hydropower plant, reported that the plant generated 63.97 GWh...
Hidroelektrane na Drini, a subsidiary of power utility ERS and the operator of the Višegrad hydropower plant, reported that the plant generated 89.21 GWh...
The hydropower plant Visegrad, operated by the subsidiary company Hidroelektrane na Drini of the power utility ERS, has shown an increase in electricity production...
The Visegrad hydropower plant (HPP), operated by Hidroelektrane na Drini, a subsidiary of power utility ERS, has reported a notable surge in electricity generation...
Hydropower plant Višegrad produced 77.77 GWh of electricity in April 2024, which is 24.5% lower compared to the previous month, when electricity generation amounted...
The European Bank for Reconstruction and Development (EBRD) has appointed a consortium to oversee the refurbishment of the Vlasinske hydropower plants, a central part...
For decades, Montenegro’s hydroelectric system has been perceived primarily through a regional lens. Its reservoirs and run-of-river plants were valued as instruments of domestic...
The shutdown of Pljevlja transforms Montenegro’s internal energy balance, but its implications extend beyond national borders. In the interconnected Balkan power system, every addition...
Montenegro’s power system is undergoing a quiet reordering of influence. Where state hydro once dominated unchallenged and Pljevlja provided the stable backbone, private wind...
As Montenegro steps into a future without Pljevlja’s coal-fired stability, the cost of balancing becomes the defining economic metric of its power system. Balancing...
X
Latest Electricity Power Trading News now available in app