HomeTagsDrought

drought

Supported byClarion Owners Engineers
Supported byClarion Owners Engineers
Supported byspot_img

Summer drought exposes Europe’s power system weaknesses as Southeast Europe faces winter risks

Europe’s electricity system entered summer 2026 without a broad adequacy threat, but record-low river levels combined with simultaneous nuclear, hydro and thermal constraints to...

Nuclear drought stress test highlights 5.9 GW flexibility gap in Southeast Europe

A simultaneous drought-related shutdown of all operating nuclear power plants in Southeast Europe would remove nearly 5.9 GW of dependable low-carbon generation from the...

SEE drought stress test exposes a regional power deficit that imports alone cannot cover

A simultaneous drought-driven shutdown of every operating nuclear power plant in South-East Europe would remove almost 5.9 GW of dependable generation from the interconnected market. On...

Danube drought cuts Serbia hydropower output and boosts storage and flexibility needs

Serbia’s prolonged drought has altered the operational role of its hydropower fleet, with electricity production tied to available water rather than installed capacity alone....

July 2026 hydropower market in Southeast Europe: Drought turns flexibility into a scarce commodity

Hydropower entered July 2026 as Southeast Europe’s most important flexible renewable resource—and one of its most constrained. Prolonged heat and drought reduced river flows...

Latest news

Nocaj’s 72 MWh battery can improve Serbian exporters’ CBAM readiness

Battery storage can make renewable electricity more predictable for Serbian exporters and improve the commercial case for renewable projects. It does not reduce embedded emissions by itself or replace CBAM evidence requirements.

Serbia’s around 2 GW battery agreements face financing test

Around 2 GW of battery storage connection agreements were reported in Serbia in 2026, but the first standalone projects still need to establish a local financing template. EMS requires a construction bank guarantee before transmission-connected projects can advance to connection contracts.

Bulgaria’s battery fleet exceeds 6 GW as solar shifts to storage

Battery operators across Southeast Europe are increasingly buying solar-heavy midday electricity and shifting it for sale in later hours, with Bulgaria leading the trend. Serbia has begun recording negative day-ahead prices, which can provide a variable source of low-cost electricity for storage.

North Macedonia frames 100 MW Bitola battery as grid infrastructure

North Macedonia is structuring its planned 100 MW / 400 MWh Bitola battery as strategic grid infrastructure, with an estimated cost of EUR 98 million. The EBRD is considering a sovereign-guaranteed loan of up to EUR 33.1 million, alongside other expected financing.

Serbian industry weighs battery ownership as SEEPEX reaches EUR 368.6/MWh

Serbian industrial companies must weigh owning batteries against buying flexibility as a service. The choice depends on whether factory-specific savings or market optimisation provides most of the battery’s value.