Slovenia: Climate negotiator challenges...

Former Slovenian State Secretary and climate negotiator Zoran Kus has filed a petition...

Romania: Constanța to get...

A new high-efficiency cogeneration plant is under development on the site of the...

Romania: Ministry of Energy...

The Romanian Ministry of Energy has finalized a five-point plan aimed at lowering...

Bosnia and Herzegovina: EPBiH...

State-owned power utility EPBiH has opened a tender for the preparation of the...
Supported byClarion Energy
HomeSEE Energy NewsRomania to add...

Romania to add 2.5 GW of new power capacity in 2025, driven by renewables and gas

Romania is set to add 2.5 GW of new electricity generation capacity in 2025, marking a major increase from the previous year, according to Energy Minister Sebastian Burduja. The boost comes from a mix of gas and renewable projects, supporting the country’s long-term energy strategy.

Among the main contributors is a new 430 MW gas unit at the Iernut power plant. One or possibly two units at the Mintia power plant, part of a larger 1.7 GW project, are also expected to come online this year. Additionally, renewable energy projects backed by the EU’s Resilience Facility are projected to bring over 1 GW of capacity by year-end.

In 2026, the Mintia plant is expected to be fully completed, while another 1.3 GW of new capacity is planned to connect to the grid.

By the end of 2025, Romania’s total installed generation capacity is expected to reach 24 GW. This development is in line with the country’s 2025–2035 energy roadmap. The planned mix includes 5 GW from wind, 4 GW from solar, and 7 GW from hydropower—primarily provided by Hidroelectrica.

Looking ahead to 2030, Romania aims to increase its generation capacity to 30 GW. Of this, 15 GW is expected to come from solar and wind, underlining a strong national shift toward renewable energy.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Slovenia: Climate negotiator challenges legality of Krsko nuclear power plant expansion plan

Former Slovenian State Secretary and climate negotiator Zoran Kus has filed a petition with the Constitutional Court challenging the legality of the national spatial plan procedure for the proposed second unit at the Krsko nuclear power plant. Representing public...

Romania: Constanța to get modern gas-hydrogen cogeneration plant, replacing 1970s infrastructure

A new high-efficiency cogeneration plant is under development on the site of the former CET Palas facility in Constanța, replacing infrastructure dating back to the 1970s. Valued at 120 million euros and largely financed through the National Recovery and...

Romania: Ministry of Energy unveils five-point plan to cut electricity prices by 20–25%

The Romanian Ministry of Energy has finalized a five-point plan aimed at lowering electricity prices, with measures expected to take effect next week. Energy Minister Bogdan Ivan stated that the initiative, developed in consultation with producers, distributors, suppliers, and...
Supported byVirtu Energy
error: Content is protected !!