The Balkan grid at...

As winter settles across South-East Europe, the region’s electricity landscape enters a season...

The Balkan power mosaic:...

The final month of 2025 finds the electricity markets of South-East Europe entering...

Winter markets at the...

The western edge of the Balkan electricity system enters December 2025 with a...

Winter prices without the...

December 2025 opens the winter season in Central and South-East Europe with a...
Supported byClarion Energy
HomeSEE Energy NewsCroatia: Construction of...

Croatia: Construction of Zabok-Lucko gas pipeline set to begin with EU recovery funds

Construction is set to begin on the Zabok-Lucko main gas pipeline, a project funded by the Croatian Government through the Recovery and Resilience Mechanism as part of the infrastructure support for the LNG terminal strategic investment project.

The new pipeline will improve the flexibility of managing existing transport capacities and increase the pipeline’s capacity to Slovenia from the current 0.26 billion to 1.5 billion cubic meters of gas.

Following a public procurement process, Plinacro signed a turnkey public works contract worth 51.83 million euros (excluding VAT) for the pipeline’s construction. The contract was awarded to a consortium consisting of Monter Strojarske Montaze, Pico Flow Controls, SCAN, and Monting. The project is expected to be completed within 15 months from the start of construction.

With works on the Zlobin-Bosiljevo main gas pipeline nearing completion and the procurement of pipes from Turkey, which are stored in Lucko, preparations are underway to begin the project. The total estimated cost of constructing the Zabok-Lucko gas pipeline is 78 million euros, fully financed through non-refundable funds from the Recovery and Resilience Mechanism under the REPowerEU plan.

The 36-kilometer pipeline will pass through Krapina-Zagorje County, Zagreb County, and the city of Zagreb. It will mainly follow the existing main gas pipeline corridor, covering the cities of Zabok, Oroslavje, Zapresic, and Sveta Nedelja, as well as the municipalities of Jakovlje and Bistra.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

The Balkan grid at a turning point: How cross-border capacities shape the winter 2025–26 electricity market

As winter settles across South-East Europe, the region’s electricity landscape enters a season shaped not by crisis but by structural interdependence. December 2025 finds the Balkan and Central-European power systems operating under a degree of cross-border coordination once unimaginable....

The Balkan power mosaic: December 2025 prices and the regional outlook for Q1 2026

The final month of 2025 finds the electricity markets of South-East Europe entering winter with a stability few would have predicted even two years ago. The whip-saw volatility of the post-Ukraine crisis era has eased, gas is trading at...

Winter markets at the periphery: How Montenegro, Croatia and Albania shape their place in the regional power price landscape

The western edge of the Balkan electricity system enters December 2025 with a familiar imbalance: structurally small power exchanges, modest liquidity, highly weather-sensitive production, and an almost total dependence on neighbouring hubs for price formation. Montenegro, Croatia and Albania...
Supported byVirtu Energy
error: Content is protected !!