Romania: PPC Renewables expands...

PPC Renewables Romania has launched the second stage of construction at the Deleni...

Greece: Alexandroupoli LNG terminal...

Gastrade has announced a new operational milestone for the Alexandroupoli LNG terminal, with...

Bulgaria: NPP Kozloduy begins...

Bulgaria’s only nuclear power plant, Kozloduy, announced that Unit 6 will undergo its...

Transelectrica launches major projects...

Romanian electricity transmission system operator Transelectrica has launched two major infrastructure projects to...
Supported byClarion Energy
HomeSEE Energy NewsHungary, Average price...

Hungary, Average price of electricity on day-ahead market of the HUPX amounted to 391.35 euros/MWh in September

The average price of electricity on day-ahead market of the Hungarian energy exchange HUPX amounted to 391.35 euros/MWh in September 2022, which is 21 % lower compared to the previous month, when average baseload price amounted to 495.29 euros/MWh.

Average HUPX DAM peak price amounted to 422.37 euros/MWh in September, 17 % lower compared to August peak price. Traded volume on the day-ahead market reached 2.07 million MWh, approximately the same as in August and 11.2 % less than in September 2021 (2.33 million MWh). Average daily traded volume in September amounted to 69,000 MWh.

Traded volume on the intraday market amounted to 370,326 MWh in September 2022, which is 2 % more compared to the previous month. Average daily traded volume on the intraday market amounted to 12,344 MWh.

Supported byOwner's Engineer banner

Recent News

Supported byspot_img
Supported byspot_img

Latest News

Supported byspot_img
Supported bySEE Energy News

Related News

Romania: PPC Renewables expands Deleni wind farm with 85 MW second phase

PPC Renewables Romania has launched the second stage of construction at the Deleni wind farm in Vaslui County, further strengthening its position as the largest wind energy project in the Moldova region. The new phase will add 85 MW...

Romania secures EU approval to keep three coal units operational until 2029

Energy Minister Bogdan Ivan announced that Romania has reached an agreement with the European Commission to keep three of its coal-fired power units in operation until 2029, following a revision of the country’s decarbonization schedule for electricity generation. According to...

Greece: Alexandroupoli LNG terminal reaches record regasification capacity after technical recovery

Gastrade has announced a new operational milestone for the Alexandroupoli LNG terminal, with its maximum daily regasification capacity increasing to 136.2 GWh as of October 21. This marks a significant rise from the 90.8 GWh per day recorded in...
Supported byVirtu Energy
error: Content is protected !!