Why OE-governed quality assurance...

In every mature renewable market, there comes a moment when engineering quality—once assumed,...

Insurance, force majeure and...

In the early stages of Southeast Europe’s renewable expansion, wind investors focused primarily...

ESG, community strategy and...

For years, wind investment strategies in Southeast Europe focused almost exclusively on technical...

The grid-ready wind farm...

A decade ago, the success of a wind farm in Southeast Europe was...
HomeTagsICGB

ICGB

Supported byClarion Owners Engineers
Supported byClarion Owners Engineers
Supported byElevatePR Serbia

Bulgaria: ICGB initiated binding faze for Greece- Bulgaria gas pipeline capacity expanding

The operator of the Greece-Bulgaria natural gas pipeline, ICGB, launched the binding phase of market testing for expanding the pipeline's capacity from 3 to...

Bulgaria: Transported volume via IGB gas pipeline exceeded 15.5 million MWh in 2023

More than 15.5 million MWh of natural gas were transported via the IGB pipeline in 2023, according to the ICGB, the operator of the...

Bulgaria: Market test for capacity expansion of IGB pipeline to be held in 2024

ICGB, the operator of the Greece-Bulgaria gas interconnection, plans to stage the binding phase of market testing in mid-2024 for the planned capacity expansion...

Bulgaria: Bulgartransgaz to work on Vertical Gas Corridor market tests

Bulgarian natural gas system operator Bulgartransgaz agreed with peers from Greece, Bulgaria, Romania, Hungary and Slovakia to establish a joint working group by September...

Bulgaria: Market participants interested in increasing IGB’s capacity to 5 bcm

The independent transmission system operator ICGB said that the non-binding phase of a procedure for assessing market demand for an increase in the capacity...

Bulgaria: 82% of IGB capacity booked

ICGB, the independent transmission system operator of the Greece-Bulgaria gas interconnection, announced after the quarterly auctions for the 2023-2024 gas year that over 82%...

Bosnia and Herzegovina: HPP Visegrad posts 155% production surge in November

A subsidiary of power utility ERS “Hidroelektrane na Drini”, the operator of the Visegrad hydropower plant, announced that the facility generated 96.83 GWh of...

Serbia’s renewable surge: How the country is quietly becoming a regional green-power leader

For years, Serbia’s energy landscape appeared frozen in time. Coal dominated generation, hydropower provided stability, and the idea of large-scale renewable deployment felt distant....

Greece moves forward with long-delayed Mesochora hydropower plant

The Greek Ministry of Environment and Energy has confirmed that the long-delayed Mesochora hydropower plant in Trikala will finally advance, bringing an end to...

Bosnia and Herzegovina: Republika Srpska accelerates major hydropower expansion amid untapped potential

The Republic of Srpska (RS) is pressing ahead with a major expansion of its hydropower sector, driven by significant untapped water resources that remain...

Serbia: EPS outlines €2 billion hydropower investment strategy through 2035

Over the next decade, Serbia is expected to see nearly 2 billion euros invested in its hydropower sector, with around 760 million euros planned...
error: Content is protected !!